Thermo Scientific LCQ Fleet Getting Started Manual page 66

Ltq series
Table of Contents

Advertisement

6
Connecting the Inlet Plumbing
Setting Up the Inlet for Loop Injections (Flow Injection Analyses)
Figure 35. Plumbing diagram for loop injection into the solvent flow from an LC into an APCI probe
Connection between port 2
of the divert/inject valve and
the LC pump
3
1
6
Loop
filler
52
LTQ Series Getting Connected Guide
4. Depending on whether you are using the APCI probe or the ESI probe, do one of the
following to connect port 3 of the divert/inject valve to the ion source:
• For the APCI probe, use two fingertight fittings and two ferrules to connect a length
of red PEEK tubing between port 3 of the divert/inject valve and the sample inlet of
the APCI probe. See
Connection between port 3
of the divert/inject valve and
the sample inlet of the APCI probe
Waste line
Figure
35.
Load
Detector
Inject
Waste
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ltq xl maldiLtq xlLxq

Table of Contents