NexStor 4900F Series User Manual page 66

Raid storage systems
Table of Contents

Advertisement

Chapter 3 - Setup and Installation
2
52
Completing the Installation
Attaching the Front Bezel (Rack and Tower Models)
d
Secure the front bezel using a Phillips screwdriver by rotating the
fasteners clockwise one-quarter turn.
Install the SFP Transceivers.
a
Insert the transceiver(s) into each of the SFP cages on the Disk I/O cards
and Host I/O cards.
The transceiver can only be installed one way. Note the orientation to
ensure proper installation.
NOTE:
Refer to the illustration on the following page.
b
Push the transceiver fully into the SFP cage so that it completely seats.
The transceiver protrudes approximately 1/2-inch from the face plate of
the card when it is fully seated.
c
(Optical Transceiver) Remove the dust covers just prior to inserting the
FC data cables and store the dust covers in a safe place.

Advertisement

Table of Contents
loading

Table of Contents