Chapter 3 - Setup and Installation

Powering On the Storage System

After you have the system setup and installed, you are ready to power on the
storage system enclosure(s).
NOTE:
1
2
3

Powering Off the Storage System

NOTE:
1
2
3
102
Powering On the Storage System
Ensure that the data cables, power cables, or other objects are not
obstructing the air flow exiting the cooling fan module.
Locate the power supply On/Off switches at the rear of the enclosure(s).
Press each power supply switch to its "On" position. (Repeat this step for
each of the attached storage system enclosure(s).)
All enclosures will perform a power on self test during their initial start.
Next power on the host computer(s) which are connected to the storage
system.
If you are planning to completely shut down the entire system, power
down the host system first.
If applicable, ensure that the controller(s) have been gracefully shut down.
Press each enclosure's power supply On/Off switches to their "Off" position.
Repeat the above step for each of the attached storage system enclosure(s).