NexStor 4900F Series User Manual page 61

Raid storage systems
Table of Contents

Advertisement

4
Locate the mounting rails and mounting hardware in the accessory kit (some
installations require cage nuts and others use standard nuts).
NOTE:
It will be helpful to have an assistant available during the
installation.
5
Install the rear mounting rails.
Secure the left and right mounting rail to the rack cabinet vertical supports
using the screws and nuts provided.
Rail Slot
Rack Vertical Support - Rear
Nut
Nut
6
Lift the enclosure into the rack cabinet and align the rear mounting rails with
the slots at the rear of the enclosure, then slide the enclosure onto the rails.
7
Secure each front mounting ear to the vertical support using the supplied
screws and nuts.
NOTE:
Ensure the enclosure is level.
Mounting
Screws
Attaching the Rails
Installing the Storage System Enclosure into the Rack Cabinet
Chapter 3 - Setup and Installation
Rail Slot
47

Advertisement

Table of Contents
loading

Table of Contents