Chapter 3
Setup and Installation
Overview
This chapter describes the procedures to install and setup the NexStor 4900F
Series RAID Storage System. Each section will step you through the hardware
installation and topology cabling configurations.
It is important to thoroughly review this information and perform the steps of
procedures in each applicable section in the order in which they are presented.
This will ensure a smooth and trouble-free installation.
The installation is divided into two sections. The first section describes installing
the enclosure(s) into the rack cabinet or installing the enclosure chassis into the
tower stand. The second section describes the topology operating mode
configuration and cabling the enclosure(s).
NOTE:
You should review the "Topologies and Operating Modes" on page 25 to ensure
a complete understanding of the options available.
For installation using DC Power Supply systems, be sure to review the
"DC Source Site Requirements" on page 5 and "Cabling the DC Power
Supplies" on page 54.
45