9
Remove the defective storage enclosure.
a
For Rack Installations. Reverse the installation procedures in Chapter 3,
"Installing the Storage System Enclosure into the Rack Cabinet" on
page 46.
OR
b
For Deskside Tower Installations. Reverse the installation procedures in
Chapter 3, "Installing the Storage System into the Tower Stand" on
page 49.
10 Install the replacement storage enclosure.
a
For Rack Installations. Follow the installation procedures in Chapter 3,
"Installing the Storage System Enclosure into the Rack Cabinet" on
page 46.
OR
b
For Deskside Tower Installations. Follow the installation procedures in
Chapter 3, "Installing the Storage System into the Tower Stand" on
page 49.
11 Re-install the SES Controller card, Disk I/O cards, and Host I/O cards.
12 Re-install the power supplies.
13 Re-install the cooling fan module.
14 Re-install the RAID Controllers in their proper slot position (Controller 0
lower slot and Controller 1 upper slot).
15 Reconnect the Fibre Channel data cables, ethernet cables, and power
cords/cables. Refer to the notations made prior to removing the cables for
their proper connection location.
16 Power on the storage enclosure(s) and then the host computer(s). Refer to
"Powering Off the Storage System" on page 102.
17 Verify that all systems are operating normally.
18 Using the packaging materials from the replacement storage enclosure,
repackage and return the defective enclosure per your RMA instructions.