Measuring The Operating Limit Of Set Values; Completing The Test; Full Scheme Distance Protection, Mho Characteristic Zmhpdis - ABB Relion 670 Series REL670 Commissioning Manual

Line distance protection 2.1 iec
Table of Contents

Advertisement

1MRK 506 355-UEN A
10.4.2.1
10.4.2.2
10.4.3
Line distance protection REL670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
Test point
Reach
Value
5
X
0.5·RFFwPP·tan (ArgLd)
R
0.5·RFFwPP
6
X
-0.5·RLdFw·tan (ArgDir)
R
0.5·RLdFw
Table
20
is used together with figure 17.

Measuring the operating limit of set values

Procedure:
1.
Supply the IED with healthy conditions for at least two seconds.
2.
Apply the fault condition and slowly decrease the measured impedance to find
the operate value for of the phase-to-earth loop L3, test point 1, according to
figure 16. Compare the result of the measurement with the expected value
according to table 19.
The corresponding binary signals that inform about the operation of the phase
selection measuring elements are available in the local HMI under
Main menu/Test/Function status/Impedance Protection/
PhaseSelection(PDIS, 21)/FDPSPDIS:x.
3.
Repeat steps
1
to
2
according to figure
When the load encroachment characteristic is deliberately set
very high in order not to have an influence, then the test points 2
and 5 can be replaced by test point 7.
4.
Repeat steps
1
to
3
L2 according to figure

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes.
Full scheme distance protection, mho characteristic
ZMHPDIS
Prepare the IED for verification of settings outlined in section
verify
settings".
Consider releasing of the zone to be tested by setting the phase selector FMPSPDIS to
On.
to find the operate values for the remaining test points
16
and table 19.
to find the operate value for the phase-to-phase fault in L1 —
17
and table 20.
Section 10
Comments
Only when RLdFW < RFFwPP
"Preparing the IED to
97

Advertisement

Table of Contents
loading

Table of Contents