Built-In Overcurrent Feature (Non-Directional); Overcurrent Feature With Current Restraint - ABB Relion 670 Series REL670 Commissioning Manual

Line distance protection 2.1 iec
Table of Contents

Advertisement

Section 10
Testing functionality by secondary injection
10.8.1.1
10.8.1.2
186
Due to the versatile possibilities of CVGAPC itself, but also the possibilities of logic
combinations in the application configuration of outputs from more than one
CVGAPC function block, it is hardly possible to define a fully covering general
commissioning test.

Built-in overcurrent feature (non-directional)

Procedure
1.
Go to Main menu/Test/Function test modes/Multipurpose protection/
GeneralCurrentVoltage(GAPC)/CVGAPC:x and make sure that CVGAPC
to be tested is unblocked and other functions that might disturb the evaluation of
the test are blocked.
2.
Connect the test set for injection of three-phase currents to the appropriate
current terminals of the IED.
3.
Inject current(s) in a way that relevant measured current (according to setting
parameter CurrentInput) is created from the test set. Increase the current(s) until
the low set stage operates and check against the set operate value.
4.
Decrease the current slowly and check the reset value.
5.
Block high set stage if the injection current will activate the high set stage when
testing the low set stage according to below.
6.
Connect a TRIP output contact to the timer.
7.
Set the current to 200% of the operate value of low set stage, switch on the
current and check the time delay.
For inverse time curves, check the operate time at a current equal to 110% of the
operate current at tMin.
8.
Check that TRIP and START contacts operate according to the configuration
logic.
9.
Release the blocking of the high set stage and check the operate and reset value
and the time delay for the high set stage in the same way as for the low set stage.
10. Finally check that START and TRIP information is stored in the event menu.
Information on how to use the event menu is found in the
operator's manual.

Overcurrent feature with current restraint

The current restraining value has also to be measured or calculated and the influence
on the operation has to be calculated when the testing of the operate value is done.
Procedure
1.
Operate value measurement
The current restraining value has also to be measured or calculated and the
influence on the operation has to be calculated when the testing of the operate
value is done.
1MRK 506 355-UEN A
Line distance protection REL670 2.1 IEC
Commissioning manual

Advertisement

Table of Contents
loading

Table of Contents