ABB Relion 670 Series REL670 Commissioning Manual page 161

Line distance protection 2.1 iec
Table of Contents

Advertisement

1MRK 506 355-UEN A
Line distance protection REL670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
IEC06000652 V3 EN
Figure 36:
Example characteristic
Non-directional earth fault current protection
Procedure
1.
Measure that the operate current is equal to the INNonDir> setting.
The function activates the START and STDIRIN output.
2.
Measure the operate time of the timer by injecting a current of 200% of the
operate value.
3.
Compare the result with the expected value.
The expected value depends on whether definite time tINNonDir or inverse time
was selected.
4.
Continue to test another function or complete the test by setting the test mode to
Off.
Residual overvoltage release and protection
Procedure
1.
Measure that the operate voltage is equal to the UN> setting.
The function activates the START and STUN signals.
2.
Measure the operate time by injecting a voltage 1.2 times set UN> operate value.
3.
Compare the result with the set tUN operate value.
4.
Inject a voltage 0.8 · UNRel> and a current high enough to operate the
directional function at the chosen angle.
5.
Increase the voltage until the directional function is released.
6.
Compare the measured value with the set UNRel> operate value.
RCADir = 0º
ROADir = 80º
Operate area
3I
0
-3U
IEC06000652-3-en.vsd
Section 10
0
155