Completing The Test; Autorecloser For 1/2/3-Phase Operation Smbrrec - ABB Relion 670 Series REL670 Commissioning Manual

Line distance protection 2.1 iec
Table of Contents

Advertisement

1MRK 506 355-UEN A
10.10.1.5
10.10.2
Line distance protection REL670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
WA1_QA1
(SESRSYN 1)
LINE1_QB9
LINE1
IEC11000274 V3 EN
Figure 43:
Objects used in the voltage selection logic

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes.

Autorecloser for 1/2/3-phase operation SMBRREC

Verification of the Autorecloser for 1/2/3-phase operation function SMBRREC for
single-phase, two-phase or three-phase reclosing attempts can be considered to
consist of two parts.
One part to verify the internal logic and timing of the function
One part to verify its interaction with the protection system
This section deals with verification of SMBRREC itself. However, it is practical to
start SMBRREC by activating a protection function, for example, by secondary
injection tests.
Prepare the IED for verification of settings outlined in section
verify
settings".
The purpose of verification before commissioning is to check that entered selections,
setting parameters and configuration render the intended result. The function is
(SESRSYN 3)
TIE_QA1
(SESRSYN 2)
LINE2_QB9
LINE2
IEC11000274-3-en.vsd
Section 10
WA1
WA2
WA2_QA1
"Preparing the IED to
203