Extended Testing; Completing The Test; Two Step Residual Overvoltage Protection Rov2Ptov; Verifying The Settings - ABB Relion 670 Series REL670 Commissioning Manual

Line distance protection 2.1 iec
Table of Contents

Advertisement

1MRK 506 355-UEN A
10.6.2.2
10.6.2.3
10.6.3
10.6.3.1
Line distance protection REL670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
For phase-to-earth measurement:
U
1
UBase VT
sec
>
×
×
100
VTprim
3
IECEQUATION2426 V1 EN
For phase-to-phase measurement:
U
VT
1
sec
>
UBase
×
×
100
VTprim
IECEQUATION2427 V1 EN
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply about 20% higher voltage than the measured operate value for one
phase.
6.
Measure the time delay for the TR1 signal and compare it with the set value.
7.
Check the inverse time delay by injecting a voltage corresponding to 1.2 × U1>.
8.
Repeat the test to check the inverse time characteristic at different over-voltage
levels.
9.
Repeat the above-described steps for Step 2 of the function.

Extended testing

1.
The tests above can be repeated for 2 out of 3 and for 3 out of 3 operation mode.

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes.

Two step residual overvoltage protection ROV2PTOV

Prepare the IED for verification of settings outlined in section
verify
settings".

Verifying the settings

1.
Apply a single-phase voltage either to a single-phase voltage input or to a
residual voltage input with the start value below the set value U1>.
2.
Slowly increase the value until ST1 appears.
3.
Note the operate value and compare it with the set value.
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply a 20% higher voltage than the measured operate value for one
phase.
Section 10
(Equation 97)
(Equation 98)
"Preparing the IED to
173