Change the magnitude and angle of phase-to-phase voltage to achieve impedances at
test points 1, 2 and 3. For each test point, observe that the output signals, START,
STLx and STPP are activated where x refers to the actual phase to be tested. After the
timer tPP for the actual zone has elapsed, also the signals TRIP, TRPP and TRx shall
be activated.

Phase-to-earth faults

For simplicity, the same test points as for phase-to-phase faults are proposed, but
considering new impedance values.
X
IEC07000010 V4 EN
Figure 19:
Proposed test points for phase-to-earth faults
Table 22:
Test points for phase-to-earth loops L1-L2 (Ohm/Loop)
Test
Reach
Value
points
1
X
ZPE · sin(ZAngPE)
R
ZPE · cos(ZAngPE)
2
X
0,5·ZPE · sin(ZAngPE)
R
0,5·ZPE + ΔR = 0,5·ZPE · (1 - cos(ZAngPE))
3
X
0,5·ZPE·sin(ZangPE)
R
0,5·ZPE - ΔR = 0,5·ZPE · (1 - cos(ZAngPE))
Check also in the same way as for phase-to-earth fault for each test point that the
output signals STPE, are activated where x refers to the actual phase to be tested. After
the timer tPE for the zone has elapsed, also the signals TRIP, TRPE and TRx shall be
activated.
50%
ZAngPE
R
Ohm/loop
IEC07000010-4-en.vsd