Line distance protection REL670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
IEC07000188 V1 EN
Figure 47:
Test of RTC with I/O

Basic IED functions

Parameter setting group handling SETGRPS

Prepare the IED for verification of settings as outlined in section
section
"Preparing for test"

Verifying the settings

1.
Check the configuration of binary inputs that control the selection of the active
setting group.
2.
Browse to the ActiveGroup menu to achieve information about the active
setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/
Function status/Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED
and observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting
groups are described in the corresponding PCM600 documents and instructions
for the operators within the SCS are included in the SCS documentation.
in this chapter.
Section 10
"Requirements"
and
243

Advertisement

Table of Contents
loading

Table of Contents