Section 7
Testing functionality
7.3.1.3
Measuring the operating limit of set values with shaped load
encroachment characteristics
1.
Subject the IED to healthy normal load conditions for at least two seconds.
2.
Apply the fault condition and slowly decrease the measured impedance to find the
operating value of the phase-to-phase fault L1-L2 for zone 1 according to test point 1 in
figure
3.
Repeat steps
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
4.
Repeat steps
to figure
7.3.1.4

Measuring the operate time of distance protection zones

1.
Subject the IED to healthy normal load conditions for at least two seconds.
2.
Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 7 in figure
measurement with the setting
3.
Repeat steps
test point 7 in figure
setting
4.
Repeat steps
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
7.3.1.5

Completing the test

Continue to test another function or end the testing by setting the parameter
under Main menu/Tests/IED test mode/TESTMODE:1. If another function is tested, then set
the parameter
ZQMPDIS(21,Z<)/ZQMPDIS:1 for the function, or for each individual function in a chain, to be
tested next. Remember to set the parameter
has been tested.
7.3.2
Phase selection with load encroachment, quadrilateral
characteristic FDPSPDIS
Prepare the IED for verification of settings as outlined in section
settings.
Values of the logical signals for FDPSPDIS are available on the local HMI under Main menu/
Tests/Function status/Impedance/FDPSPDIS/FDPSPDIS:1. The Signal Monitoring in PCM600
shows the same signals that are available on the local HMI.
52
10
and table 3. Compare the result of the measurement with the set value.
1
to
2
to find the operating value for the remaining test points.
1
to
3
to find the operating value for the phase-to-earth fault L3-E according
11
and table
4
Test point 6 is intended to test the directional line of impedance
protection. Since directionality is a common function for all 5 measuring
zones, it is only necessary to test point 6 once, in the forward direction.
Directional functionality testing (trip inside, no-trip outside) should
always be carried for all impedance zones set with directionality (forward
or reverse).
1
to
2
to find the operating time for the phase-to-earth fault according to
11
and table 4. Compare the result of the measurement with the
t1PE .
1
to
2
to find the operating time for all other used measuring zones.
Blocked to No under Main menu/Tests/Function test modes/Impedance/
© Copyright 2013 ABB. All rights reserved
10
and table
3
for zone 1. Compare the result of the
t1PP .
Blocked to Yes , for each individual function that
1MRK 506 336-UEN B
TestMode to Off
Preparing the IED to verify
Line distance protection REL650
Commissioning manual
M14944-126 v6
M14944-154 v5
M14944-167 v3
M13906-3 v7.1.1