Automatic Implementation With The Bump Test Station - Dräger X-AM 5000 Technical Manual

Multi-gas monitor
Hide thumbs Also See for X-AM 5000:
Table of Contents

Advertisement

Automatic implementation with the Bump Test Station

Prerequisite:
The device must first be configured for the automatic function test with gas (bump test)
using the PC software Dräger CC Vision.
Activating the device for the automatic function test.
Composition of test gas (mixed gas) – standard on delivery: 50 ppm CO, 15 ppm
H
S, 2.5 vol. % CH
2
Define which measuring channels should participate in the automatic function test.
All measuring channels participate in the function test by default.
Prepare the Bump Test Station according to the instructions.
Switch on the device and insert it into the receptacle of the Bump Test Station until
it engages.
Ex
%UEG
O
2
Vol%
CO
ppm
H
S
2
ppm
The function test with gas is started
automatically. The special symbol
»
« (for bump test) flashes.
If a gas alarm (Quick bump test) is trig-
gered and the preset bump test con-
centration (Extended bump test) is
reached within the specified time, the
display shows the current gas concen-
tration, alternating with » OK « .
, 18 vol. % O
4
2
0
Maintenance
ch
4
%LEL
O
2
Vol%
CO
ppm
H
S
2
ppm
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents