Bump Test; Testing The Signal Chain; Led Test; Battery Pack - Dräger Polytron 6100 Instructions For Use Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 37
13.2

Bump test

A bump test requires test gas to be applied to the sensor.
A bump test (Bump Test) is a quick test to check the sensitivity without
transmitting the measured value to the controller. The feature is available in
PolySoft.
13.3

Testing the signal chain

To test the signal chain from the gas detector to the controller, the gas reading
(Primary Value [PV]), device variable status, and device status can be
simulated. The simulation mode is available in PolySoft.
The simulation takes into account the entire device behavior.
During testing, the simulated gas concentration and delays of times alarm is
activated must be checked. Several transmitted gas readings (Primary Values
[PV]) need to be recorded by the gateway. The times between the recorded gas
readings (Primary Values [PV]) must be checked.
The signal chain can also be tested with test gas. The gas concentration and
delays in the signal chain must also be checked.
The effects on the delay of the time to activate the alarm are mainly caused by
the reaction time of the sensor and by the settings of the burst mode (Burst
Mode) (see "Burst Mode", page 48).
13.4

LED test

The Dräger PolySoft configuration software can be used to perform an LED test
to verify the function of the LED display.
No errors or warnings should be active during the LED test.
Instructions for use
|
Dräger Polytron
®
6100 EC WL, Dräger Polytron
13.5

Battery pack

13.5.1 Battery charge

The gas detector outputs three warning thresholds for the battery charge during
operation.
Status
Measured
value
Battery warning 1
present
Battery warning 2
present
Battery fault
NaN

13.5.2 Changing the battery pack

For information on changing the battery pack, see "Set up battery operation",
page 46.
®
Repeater WirelessHART
Maintenance
LED display Time before
Explanation
complete
discharge
none
2-6 months
Order bat-
tery pack.
Yellow LED
Tempera-
Change bat-
flashes
ture depen-
tery pack.
dent approx.
1-3 weeks
(at least 24
operating
hours after
first occur-
rence).
Yellow LED
-
A shut-down
lights up
is possible at
continuously
any time.
®
|
en
61

Advertisement

Table of Contents
loading

Table of Contents