Toshiba strata DK8 Installation Instructions Manual page 18

Hide thumbs Also See for strata DK8:
Table of Contents

Advertisement

INSTALLATION-SITE REQUIREMENTS
SECTION 100-816-202
MARCH 1993
DK16 BASE AND EXPANSION
UNIT CLEARANCE
FRONT
VIEW
-4
2+-----
20" ------4
2"+-
2"
TOP
VIEW
t
I
EXP
BASE
3.5"
\
WALL
FIGURE 2-3
DK16 COMBINED BASE AND
EXPANSION KEY SERVICE UNIT
MINIMUM CLEARANCE REQUIREMENTS
and optioned
STRATA
DK16
system.
Refer
to
Chapter
4 for DK16 key service unit wall mounting
instructions.
4.00
The systems
require a solid earth ground
for
proper
operation.
Failure to provide
ground
may
lead to confusing
trouble
symptoms
and, in ex-
treme cases,
system failure.
The AC power
cord
contains
a conductor
for the "third wire ground"
provided
by the commercial
power
outlet.
The
third-wire
ground
should
be the only ground
nec-
essary for the DK8/DK16;
this ground
must origi-
nate at the buildings
main power distribution
panel
and
have
a solid connection
to earth
ground.
(Figure 2-4)
4.10 Third
Wire Ground
Test
3.02
The following
conditions
must be considered
when selecting
a location forthe key service unit(s):
The location
MUST BE:
l
Dry and clean
l
Well ventilated
l
Well illuminated
l
Easily accessible
4.11 Test the "third wire ground"
for continuity
by
either measuring
the resistance
between
the third
prong
terminal
(earth
ground)
and a metal cold
water
pipe
(maximum:
1 ohm),
or by using
a
commercially
available
earth ground
indicator.
If
neither procedure
is possible,
perform
the follow-
ing earth ground
test procedure:
WARNING!
The location
MUST NOT BE:
Hazardous voltages that may cause death
l
Subject
to extreme
heat or cold
or injury are exposed during the folio wing
l
Subject
to corrosive
fumes,
dust, or other air-
test. Use great care when working with AC
borne contaminants
power line voltage.
l
Subject
to excessive
vibration
l
Next to television,
radio, office automation,
or
high frequency
equipment
1)
Obtain
a suitable
voltmeter,
and set it for a
possible
reading
of up to 250 VAC.
3.03
If reserve
power
is to be installed
for the
STRATA
DK16, the batteries
will require
a well-
ventilated
location
close (within
nine feet) to the
DKSUB16
(the optional
Toshiba-supplied
battery
cable
is 9 feet
in length).
The
STRATA
DK8
reserve
battery
(HPFB)
should
be mounted
di-
rectly above the DKSU8
as shown
in Figure 2-l.
3.10
Electrical/Environmental
Requirements
and Characteristics
3.11
The electrical/environmental
requirements
and characteristics
for each system
are provided
in Table 2-A.
4 GROUNDING
REQUIREMENTS
2-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata dk16

Table of Contents