Toshiba strata DK8 Installation Instructions Manual page 17

Hide thumbs Also See for strata DK8:
Table of Contents

Advertisement

INSTALLATION-SIJE REQUIREMENTS
SECTION 100-816-202
MARCH 1993
1 GENERAL
1
.OO This chapter
defines
the installation
site re-
quirements
necessary
to ensure
a proper operat-
ing environment
for the STRATA
DK8 and DK16.
Also included
are grounding
requirements.
2 INPUT POWER REQUIREMENTS
2.00
The system
requires
an input power source
of 117VAC
nominal
(85VAC - 135VAC),
50/60 Hz,
15 amps.
The AC outlet
is recommended
to be
dedicated
and unswitched,
with a solid third wire
ground
(refer to Paragraph
4). This is to eliminate
interference
from branch circuit motor noise or the
like, and to prevent
accidental
power-off.
2.01 To avoid accidental
power turn-off, it is recom-
mended that an ON/OFF wall switch not be used on
this dedicated
AC circuit.
DK8 KEY SERVICE UNIT
AND HPFB CLEARANCE
FRONT
VIEW
1
-42"+-10"
42"/4-
2"
Top*ALL
FIGURE 2-1
DK8 KEY SERVICE UNIT AND HPFB
MINIMUM CLEARANCE REQUIREMENTS
2.02
An option
Reserve
Power
Battery
and
Charger
(HPFB)
is available
for use with the
STRATA
DK8 to serve as a power failure backup.
For the STRATA
DKl6,
a reserve
power
source
(two customer-supplied
12-volt batteries)
may be
connected
to the system
to serve
as a power
failure backup.
3 SITE CONSIDERATIONS
3.00 Clearance and Location Requirements
3.01
The key service units must be wall mounted.
Figure 2-1 shows the minimum
clearance
require-
ments for the STRATA
DK8 system,
and includes
the recommended
mounting
location
and clear-
ance requirements
for the optional
HPFB. Figures
2-2 (Base Key Service
Unit) and 2-3 (Base and
Expansion
Key Service
Unit together)
show the
minimum
clearance
requirements
for the standard
DK16 BASE KEY SERVICE UNIT CLEARANCE
FRONT
VIEW
+2"+-12.25"
42"+--
-
TOP
VIEW
1
f
,
I
WALL
L
FIGURE 2-2
DK16 BASE KEY SERVICE UNIT
MINIMUM CLEARANCE REQUIREMENTS
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata dk16

Table of Contents