Anritsu MT9083 Series Operation Manual page 60

Access master remote control
Table of Contents

Advertisement

Chapter 4 OTDR Commands
4.2.4 INITiate:AUTo Command
Syntax:
INITiate:AUTo
Parameters:
None
Description:
Starts OTDR auto-test. All test parameters are automatically obtained during the
pre-scan. This command is an overlapped command.
When this command is executed with "Wavelength all" selected, the measurement
starts with the minimum wavelength, and no measurement is done for other
wavelengths.
Example:
init:aut
Response:
None
Errors:
(–200, "std_execGen, Test is Active")
(–200, "std_execGen, Instrument is Busy")
(–200, "std_execGen, Start Test Failed")
(–200, "std_execGen, Connection Check Failed")
(–200, "std_execGen, Live Fiber Check Failed")
4.2.5 INITiate:RTIMe Command
Syntax:
INITiate:RTIMe
Parameters:
None
Description:
Starts OTDR real time-test. Starts OTDR real time test with currently selected
settings. This command is an overlapped command.
When this command is executed with "Wavelength all" selected, the measurement
starts with the minimum wavelength, and no measurement is done for other
wavelengths.
Example:
init:rtim
Response:
None
Errors:
(–200, "std_execGen, Test is Active")
(–200, "std_execGen, Instrument is Busy")
(–200, "std_execGen, Start Test Failed")
(–200, "std_execGen, Connection Check Failed")
(–200, "std_execGen, Live Fiber Check Failed")
4.2.6 INITiate? Command
Syntax:
INITiate?
Parameters:
None
Description:
Queries if test is initiated.
Example:
init? --- 0<END>
Response:
Possible response range: 0|1
0 = Test is NOT active.
1 = Test is currently active.
Errors:
None
4-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents