GE Aespire 7100 Technical Reference Manual page 249

Anestesia machine
Table of Contents

Advertisement

9 Repair Procedures
9.8.5 Replace
1. Remove the upper rear panel (Section 9.2).
vaporlzer manlfold
2. Remove the front flowmeter shield (Section 9.7.1).
M1110140
08/07
3. Remove the right side panel (A).
4. From the front of the machine , remove the screw (8) at the right upright of the
flowhead beze l.
5. From the back of the machine , remove the two screws (C) that hold the vaporizer
manifold vertical
suppo民 to
the flowhead bracke
t.
6. From the back of the machine , remove the two screws (0) that
hold 由 e
vertical
suppo此 to
the vaporizer manifold.
7. Remove the vertical support from the machine.
8. While holding the vaporizer manifold , remove the two screws (E) at the right-hand
extrusion to release the manifold.
9. Install the new vaporizer manifold in reverse order. Do not fully tighten the screws
until they are all in place.
• Attach the new manifold to the right-hand extrusion (E).
• Attach the vertical
suppo民 to
the vaporizer manifold (0).
• Attach the bottom of the vertical
suppo眈 to
the flowhead bracket (C).
• Attach the vertical
suppo民 to
the front bezel (8).
10.
Ti ghten the mounting screws in the following order: E , 0 , C , 8.
11. Reassemble the machine.
12. Perform the checkout procedure (Section 3).
9-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents