After Replacingthe Control Board Orthe Control Module - GE Aespire 7100 Technical Reference Manual

Anestesia machine
Table of Contents

Advertisement

Aespire 7100
8.2 After replacing the Control Board or the Control Module
8 -4
1. Load the appropriate
so伽'are
revision
(Sec世on
8.3) using a software memory stick
that matches the
50筒ware
revision ofthe replaced control board (control module).
2. Activate the appropriate options on the
Upg,田de
Optlons menu
(Section 4.11).
A. Ifthe original
con币guration
included all ofthe optional features
,
enterthe Key
Code supplied
wi白白e
replacement Control Board (Control Module) following
Stepsa. 由 rough
d. , below.
B. If the original configuration included only some optional features , enter the
Replacement Control Board Key Code obtained from the Key Code Generator
web site , as follows.
a. Enter the Servlce Mode.
b. Select Upgtade Optlons.
c.
Prior to installing the new Key Code , reset the options key by entering the
following key code: GOOOOOO.
d. Th en enterthe
approp阳te
Key Code to
resωre
the original Upgrade
Options.
3. On the
Sys
tem Co nflgu
l8
t/on menu
,
reset 世le
configuration
to
match the settings
recorded in Section 8.1
4. If required
,
record the new (web site generated) Key Code on the label provided in
the replacement Control Board kit (or on the Control Module).
5.
Affi 以 the
label to the back ofthe display module as shown.
Replacement
Co
ntrol
Boa叫
08/07
Mll10140

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents