9-24
15. After calibrating the needle valve
,
put the spacerthe N
2
0 needle valve spindle.
Spacer
16. Put the chain on the O
2
knobjsprocket assembly and the N
2
0 sprocke
t.
17. Install the chain and sprockets on the needle valve spindles as an assembly. 00 not
tighten the set screws.
18. Install the N 2 0 knob. 00 not tighten the set screws.
19.
Perform 由 e
link system calibration (Section 5 .4).
20. Install the flowmeter panel shield.
2 1. Perform the checkout procedure (Section 3).