3.14 Power failure test
3 Checkout Procedure
1. Connect the power cord to a mains outle
t.
Th e mains indicator on the
display comes on when AC Power is connected.
If the indicator is not on
,
the display assembly is not receiving AC power.
• Verify AC
powerωthe
machine (reset circuit breaker).
• Check fuses in display assembly's inlet module.
• Check fuses in machine's AC inlet assembly.
2. Setthe system switch to On.
3. Unplugthe
powerco时 with 由 e
system turned on.
4. Make sure that the power failure alarm comes on.
5. Make sure the following message is on the ventilator display:
• .On
Ba忧ery
- Power OK?"
6. Connectthe powercable again.
7. Make sure the alarm cancels.
3.15 Electrical safety tests
Mll10140
08/07
Make sure the system is completely assembled and all accessory devices are
connected to electrical
ou甘ets.
1. Connectan approved testdevice (e.g. UL , CSA , or AAMI) and verifythatthe
leakage current isless than:
Voltage
120jl00Vac
220j240Vac
Max. Leakage Current
300μAmps
500μAmps
2. Make sure thatthe resistance to ground isless than O.2Q between an
exposed metalsurface and the ground pin on the power cord.
3-19