Revisions - LG SV-iS5 Instruction Manual

Variable frequency drives
Hide thumbs Also See for SV-iS5:
Table of Contents

Advertisement

Revisions

Publishing date
1
Feb, 1999
2
April, 2000
3
March, 2001
4
July, 2001
5
May, 2002
6
June, 2002
7
Dec, 2002
8
Jan, 2003
9
April, 2003
10
July, 2003
11
Jan., 2004
12
April, 2004
13
Feb, 2005
Morek IT OÜ, Rauna 24, 76506 Saue Harjumaa, Estonia. www.morek.eu Tel. +372 604 1423 Fax +372 604 1447 morek@morek.eu
Changes to be made S/W Version
1.00
1.03
1.05
1.06
1.07
2.00
2.01
Chapter 7. DB Unit,
2.01
Appendix C
Sub-D board
2.01
excluded
Declaration of
2.01
Conformity (DOC)
2.01
S/W Update
2.11
2.11
Models and description added.
Peripheral devices added or changed.
Sub-D not available.
CE models units ranging from 30kW to 75kW
added to DOC.
1) Page 178, Group 3 DBU dimension revised
2) Page 192~195, DOC revised
3) Page 138, EXT -12 description revised
4) Page 122, [Exchange] diagram, AXBà
AXC revised
5) Page 131, 132, CLOEDà CLOSED
6) Page 149, APP-24 7-segment display
23à24
7) Page 153, DB Unit, 15~30HPà 15~100HP
8) Page 181, MC Fail and Overspeed
protection added
1) UL Marking added
2) Fuse and breakers specification added
3) Power/Control Terminal specification revised
1) Built-in DBU models included.
3) Overspeed & M/C Fail added.
4) Power Terminal explanation changed.
199
Note

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents