LG SV-iS5 Instruction Manual page 128

Variable frequency drives
Hide thumbs Also See for SV-iS5:
Table of Contents

Advertisement

Chapter 6 - Parameter Description [I/O]
[XCEL-L, XCEL-M, XCEL-H]
By setting P1, P2 and P3 terminals to ' XCEL-L' , ' XCEL-
M' and ' XCEL-H' respectively, up to 8 different Accel and
Decel times can be used. The Accel/Decel time is set in
DRV-01 ~ DRV-02 and I/O-25 ~ I/O-38.
The Accel/Decel time is determined by the combination
of P1, P2 and P3 terminals as shown in the following
table.
Accel/Decel
Parameter
Time
Code
Accel Time-0
DRV-01
Decel Time-0
DRV-02
Accel Time-1
I/O-25
Decel Time-1
I/O-26
Accel Time-2
I/O-27
Decel Time-2
I/O-28
Accel Time-3
I/O-29
Decel Time-3
I/O-30
Accel Time-4
I/O-31
Decel Time-4
I/O-32
Accel Time-5
I/O-34
Decel Time-5
I/O-35
Accel Time-6
I/O-36
Decel Time-6
I/O-37
Accel Time-7
I/O-38
Decel Time-7
I/O-39
0: OFF, 1: ON
Output Frequency
Ref.
Freq.
Time 0 Time 1 Time 2 Time 3 Time 4 Time 5 Time 6 Time 7
ON
ON
P1-CM
ON
P2-CM
P3-CM
FX-CM
[Multi-Accel/Decel Time Operation]
Related Functions:
I/O-25 ~ I/O-38 [1
Morek IT OÜ, Rauna 24, 76506 Saue Harjumaa, Estonia. www.morek.eu Tel. +372 604 1423 Fax +372 604 1447 morek@morek.eu
XCEL-H
XCEL-M
XCEL-L
(P3)
(P2)
(P1)
0
0
0
0
0
1
0
1
0
0
1
1
1
0
0
1
0
1
1
1
0
1
1
1
Time
ON
ON
Time
ON
Time
ON
Time
ON
Time
~7
Accel/Decel Time]
st
th
[Dc-brake]
DC Injection Braking can be activated during inverter
stopped by configuring one of the multi-function input
terminals (P1, P2, P3) to ' Dc-bake' . To activate the DC
Injection Braking, close the contact on the assigned
terminal while the inverter is stopped.
[Exchange]
Exchange is used to bypass the motor from the inverter
line to commercial power or the opposite. To bypass the
motor to commercial line, set the ' Exchange' function in
multi-function output terminal and ' INV line' , ' COMM line'
function in multi-function output terminal. Speed search
function (FU2-22) is activated automatically during
exchanging operation.
MCCB
R
S
T
G
Forward Run/Stop
FX
Reverse Run/Stop
RX
' Exchange'
P1
Factory Setting:
' Speed -L'
P2
' Speed -M'
P3
' Speed -H'
Common Terminal
CM
Potentiometer
Shield
(1 kohm, 1/2W)
Power supply for
speed signal:
VR
+ 11V, 10mA
Speed signal input:
V1
0 ~ 10V
Speed signal input:
I
4 ~20mA (250ohm)
Common for
5G
VR, V1, I
2
Speed signal Input
[Wiring to By-Pass Motor to Commercial line]
122
M1
U
MOTOR
V
W
M2
FM
5G
AC220V Line
30A
30C
30B
M1
M2
AXA
M 1
AXC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents