Chapter Overview; Chapter 4 Run The Relative Standard Curve Experiment - abi 7500 Getting Started Manual

Real-time pcr system
Table of Contents

Advertisement

Chapter 4 Run the Relative Standard Curve Experiment

Chapter Overview

Chapter Overview

Example
Experiment
Workflow
Notes
66
Applied Biosystems 7500/7500 Fast Real-Time PCR System Getting Started Guide for Relative Standard Curve
This chapter explains how to perform a run on the Applied Biosystems 7500/7500 Fast
Real-Time PCR System.
1. Prepare for the run.
2. (Optional) Enable the notification settings.
3. Start the run.
4. Monitor the run.
5. Unload the instrument.
Start Relative Standard Curve Experiment
Design the Experiment (Chapter 2)
Prepare the Experiment (Chapter 3)
Run the Experiment (Chapter 4)
Analyze the Experiment (Chapter 5)
End Experiment
and Comparative C
Experiments
T

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7500 fast

Table of Contents