NEC EXPRESS 5800 User Manual page 47

Nec electronics america server user manual
Hide thumbs Also See for EXPRESS 5800:
Table of Contents

Advertisement

POST
POST (Power On Self-Test) is the server's self-diagnostic program stored in the system memory.
When you power on the server, the system automatically runs POST to check the system board,
ECC memory module, CPU module, keyboard, and mouse. POST also displays messages of the
BIOS setup utility, such as the start-up message, while in progress.
With the factory setup of the server, the NEC logo appears on the display unit while POST is in
progress. (To display the POST check results, press Esc.)
You can set the POST check results to appear on the display unit
NOTE:
without pressing Esc. To do so, select "Enabled" for "Boot-time
Diagnostic Screen" under the Advanced menu of the BIOS setup utility.
You don't always need to check the POST check results. Check messages that POST displays
when:
You use the server for the first time.
!
The server appears to fail.
!
The server beeps for many times between power-on and OS start-up.
!
An error message appears on the display unit.
!
System Overview 1-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/120rb-1

Table of Contents