Inspect And Grind Valves - Toyota 7M-GE Repair Manual

Table of Contents

Advertisement

ENGINE
MECHANICAL
-
Cylinder
Head
SST
Snap Ring
EM063
82
(f)
$u;ily
heat the cylinder
head to approti;
0 *
(g)
Using SST and hammer,
drive in a new valve guide
bushing
until the snap ring makes
contact
with the
cylinder
head.
SST 09201-70010
Overall Length
II
[r
_-
2606.
-- , :,"
(h)
Using a sharp 6 mm (0.23 in.) reamer, ream the valve
guide bushing
to obtain
standard
specified
clearance
(See page EM-471
between
the.valve
guide bushing
and new .valve.
11.
INSPECT
AND GRIND
VALVES
(a)
Grind the valve only enough
to remove
pits and car-
bon.
(b)
Check that the valve are ground
to the correct valve
face angle.
Valve
face angle:
44.5"
(c)
Check the valve head margin
thickness.
Standard
margin
thickness:
1.3 mm (0.051
in.)
Minimum
margin
thickness:
0.5 mm (0.020
in.)
If the valve head margin
thickness
is less than minimum,
replace the valve.
(d)
Check the valve overall length.
Standard
overall
length:
98.15
mm (3.8842
in.)
Minimum
overall
length:
97.75
mm (3.8484
in.1
If the valve overall
length
is less than minimum,
replace
the valve.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7m-gte

Table of Contents