Steps
NO.
P191 CHECK UL2
TRIGGER–ON: The pressure differential between suction and discharge pressures did not change
as expected when the Rear Unloader (UL2) was de-energized / loaded (discharge pressure should
rise and suction pressure should drop) or when it was energized / unloaded (discharge pressure
should drop and suction pressure should rise.
UNIT CONTROL:
RESET CONDITION: Auto Reset if Pretrip is started again, or alarm may be manually reset via
keypad or by turning the unit off, then back on again.
NOTE: Follow the steps below until a problem is found. Once a repair or correction has been made, clear the
alarm(s). (See Note 1 page 7−2.) . Operate the unit through the appropriate modes to see if any active alarm
occurs. Continue with the steps below as necessary.
1
Check wiring to DPT & SPT
a. Verify that correct wires are con-
nected to each transducer
b. Verify that correct transducer is be-
ing used in each position.
2
Check for Check UL2 Alarm
Check for alarm 86 or P164
3
Check System Pressures
Install manifold gauge set and check
and compare compressor discharge
& suction pressures with those
shown on the microprocessor dis-
play.
4
Check Rear Unloader (UL2) Operation - Unit must be running. (See Note 5 page 7−2)
Check operation of Rear Unloader
(UL2)
62-11389
Alarm/Cause
Engine and Standby Operation: Pretrip will fail in test 13 and display
"PRETRIP FAIL AND COMPLETED".
7−94
Corrective Action
Plugs to transducers are the same. The correct wire
plug must be connected to the proper transducer.
Mechanical connections to transducers are the
same.
The Discharge Transducer should have a RED mark-
ing dot on it.
The Suction Transducer should have a BLUE mark-
ing dot on it.
Alarm conditions must be corrected and the alarm
cleared to continue
Suction and Evaporator Outlet pressures must be
above 3 psig (0.2 bar.)
Suction, Evaporator Outlet & Discharge Pressures
must have the same reading on gauges & on micro-
processor display.
NOTE: Microprocessor Suction (CSP and Evapo-
rator (EVOP) pressure readings have a maximum
value of 100 psig (7.5 bar.) The actual pressure
must be lower than 100 psig in order to perform
this test.
See Section 8.7.6.
Unloader must load and unload properly.