g. Mount the dual power feed unit (with four screws) on the two poles at the front of
Note – When securing the rack-mountable dual power feed unit on the equipment rack,
keep it positioned close to the PSUs of the M8000 server.
Mounting the Screws of Rack-mountable Dual Power Feed (Rear of M8000)
FIGURE 24-3
h. Remove the right screw securing the connector unit at the rear of the dual power
i. Mount the two brackets (mound shaped) on the two poles (with two screws for
j. Secure the rear of the dual power feed unit on the two brackets (with three screws
k. Connect the bus bars that were mounted in
l. Connect the connectors of the four cables protruding from the rear of the dual
Chapter 24
the equipment rack of the M8000 server.
feed unit, loosen the left screw, slide the connector unit to the right, and remove it.
each pole) at the rear of the equipment rack of the M8000 server.
each).
dual power feed unit by using the two bus bars (Z shape) from the installation kit.
Secure them with bolts. [Torque: 8.24 N•m (84 kgf•cm)]
power feed unit to the DC1 connector panel.
Addition and Deletion of a RDPF Option, Power Cabinet, and M9000 Expansion Cabinet
screws (three on both sides)
Step b
to the bus bar at the rear of the
24-7