Fujitsu SPARC Enterprise M8000 Service Manual page 130

Oracle
Hide thumbs Also See for SPARC Enterprise M8000:
Table of Contents

Advertisement

M9000 Server Three-Phase Power Feed
Main Line Switch (M9000 Server with Three-Phase Power Feed)
FIGURE 4-9
Main line
switch (x1)
ACSTPH#0
Main line switch
for dual power
feed (x1)
ACSTPH#1
Power cabinet
(for Expansion cabinet)
Note – Same type of switch is used for main line switches in base cabinet and power
cabinet on a system with three-phase dual power feed.
4-36
SPARC Enterprise M8000/M9000 Servers Service Manual • October 2012
Expansion cabinet
Rear
Base cabinet
Power cabinet
(for Base cabinet)
Main line switch
for dual power
feed (x1)
ACSTPH#1
Main line
switch (x1)
ACSTPH#0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m9000

Table of Contents