Fujitsu SPARC Enterprise M8000 Service Manual page 144

Oracle
Hide thumbs Also See for SPARC Enterprise M8000:
Table of Contents

Advertisement

2. Bind the cables from the external I/O expansion unit with a short hook-and-loop
fastener while taking care not to touch the main line switch of the ACS. (See (1) in
FIGURE 4-18
3. Fasten the cables with a short hook-and-loop fastener to the cable holder at location
(2) shown in
FIGURE 4-18
4. Fasten the cables with a short hook-and-loop fastener to the cable holder at location
(3) shown in
5. Also bind the cables with a short hook-and-loop fastener at a location near the floor
panel. (See (4) in
Binding the cables near the floor panel facilitates cable handling through floor panel
openings.
4-50
SPARC Enterprise M8000/M9000 Servers Service Manual • October 2012
)
.
FIGURE 4-18
Magnified View of Part A (M8000, Rear View)
.
FIGURE 4-19
)
FIGURE 4-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m9000

Table of Contents