Preparing For Installation - Extreme Networks Summit 300-24 Hardware Installation Manual

Summit 200 e, 300 e, 400 e, i series
Hide thumbs Also See for Summit 300-24:
Table of Contents

Advertisement

14
Installing and Connecting
BlackDiamond 6800 Series Power
Supplies
This chapter includes the following topics:
• Preparing for Installation on page 241
• Installing a BlackDiamond 6800 Series AC Power Supply on page 243
• Replacing a BlackDiamond 6800 Series AC Power Supply on page 246
• Installing a BlackDiamond 6800 Series DC Power Supply on page 248
• Removing a BlackDiamond 6800 Series DC Power Supply on page 251
NOTE
Read the information in this chapter thoroughly before you attempt to install, remove, or supply power to
any BlackDiamond power supply.

Preparing for Installation

Complete the following tasks before installing any switch components:
• Ground the rack (see "Protective Grounding for the Rack (Alpine and BlackDiamond Switches)" on
page 40).
• Mount the chassis in a rack (see "Installing the Chassis" on page 234).
• Ground the chassis (see "Grounding the BlackDiamond 6800 Series Chassis" on page 238).
You need the following tools and equipment to install the BlackDiamond 6800 series AC power
supplies:
• ESD-preventive wrist strap
• # 1 Phillips screwdriver
CAUTION
The power supply weighs approximately 30 pounds (14 kg).
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
241

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents