ServiceWatch, Summit, Summit24, Summit48, Summit1i, Summit4, Summit5i, Summit7i, Summit 48i, SummitRPS, SummitGbX, Triumph, vMAN, the Extreme Networks logo, the Alpine logo, the BlackDiamond logo, the Summit logos, the Extreme Turbodrive logo, and the Color Purple, among others, are trademarks or registered trademarks of Extreme Networks, Inc.
Planning Your Site Step 1: Meeting Site Requirements Step 2: Planning for Stacking (Summit “e” Series Only) Step 3: Evaluating and Meeting Cable Requirements Step 4: Meeting Power Requirements Meeting Site Requirements Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 4
Summit 300 “e” Series Switches Summit 300 Features Summit 300-24 Switch Summit 300-48 Switch Summit 300-48 Switch LEDs Load Sharing Power Supplies Summit 300 Automatic Failover Summit 400 “e” Series Switches Summit 400-24 Switches Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 5
Ethernet Management Port PCMCIA Slot Power Sockets Label Summit1i, Summit5i, Summit7i, and Summit48i Switch LEDs Summit48i Switch LEDs GBIC Ports Power Sockets Label Reset Button Console Port Summit48si Switch LEDs Mini-GBIC Ports Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 6
Disconnecting a Power Cable with an Installed Cable Retaining Bracket Installing the Summit48si Switch DC Power Supply Preparing and Attaching the DC Power Supply Cable Attaching the Connector to the DC Power Supply Part 4 Alpine Switch Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 7
Installing an Alpine 3808 or Alpine 3804 DC Power Supply Selecting and Preparing DC Cabling Installing the Power Supply Attaching the Cables and Supplying Power Supplying Power to the Alpine 3802 DC Power Supply Selecting the Cabling Attaching the Cables and Supplying Power Verifying Successful Power Installation...
Page 8
Installing the Alpine 3808 or Alpine 3804 Fan Tray Part 5 BlackDiamond Switch Chapter 12 BlackDiamond 6800 Series Switch Overview Features Port Connections Fans Switch Connectivity and the Backplane Packet Switching and Routing BlackDiamond 6816 Switch Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 9
Overview of the BlackDiamond Management Switch Fabric Module MSM Activity MSM Memory MSM LEDs Installing MSMs Verifying the MSM Installation Replacing MSMs Chapter 16 BlackDiamond 6800 Series I/O Modules Configuring I/O Modules 10GX Module Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 10
Connecting Equipment to the Console Port Logging In for the First Time Part 7 Appendixes Appendix A Safety Information Important Safety Information Power Power Cable Fuse Connections Lithium Battery Sicherheitshinweise (German) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 11
Safety Information Preparing to Install or Replace a GBIC Installing or Replacing a GBIC Installing Mini-GBICs Safety Information Preparing to Install or Replace a Mini-GBIC Installing or Replacing a Mini-GBIC Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 12
Appendix E Installing the Summit Option Card and XENPAK Modules Installing the Summit Option Card Installing a XENPAK Optical Transceiver Module Removing a XENPAK Module Index Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
This preface provides an overview of this guide, describes guide conventions, and lists other publications that might be useful. NOTE To ensure proper operation of your Extreme Networks equipment, read this guide before you install any Extreme Networks equipment. Introduction ®...
• Ethernet switching and bridging concepts • Routing concepts • Simple Network Management Protocol (SNMP) See the ExtremeWare Software User Guide for information about configuring an Extreme Networks switch. NOTE If the information in the Release Notes shipped with your switch differs from the information in this guide, follow the Release Notes.
• ExtremeWare Software User Guide • ExtremeWare Software Command Reference Guide • ExtremeWare Release Notes Documentation for Extreme Networks products is available from the Extreme Networks website at the following location: http://www.extremenetworks.com/services/documentation/ You can select and download the following Extreme Networks documentation from the Documentation section of the Services page: •...
Preface About This Guide This guide describes how to prepare your site and how to install, maintain, and operate your Extreme Networks switch. It contains information about features that are common to all switches, as well as switch-specific features. This guide contains seven parts: •...
Page 17
Appendix E, “Installing the Summit Option Card and XENPAK Modules” describes how to install the Summit Option Card and associated XENPAK modules to add high-performance uplink ports to the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 18
Preface Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Common Switch Features This chapter describes the features that are shared in common by the Extreme Networks family of switches. The following topics are described in detail: • Software Images on page 21 • Full-Duplex Support on page 22 • Management Ports on page 22 •...
• BlackDiamond—Management Switch Fabric Module (MSM64i) for the BlackDiamond series switch. Extreme Networks does not recommend that you use the management port to route traffic to any front panel port on the switch. The management port is designed for switch management purposes.
Instructions to install mini-GBICs are in Appendix D, “Installing GBICs and Mini-GBICs”. GBIC Type and Hardware/Software Support Most Extreme Networks switches support two types of GBICs: the Parallel ID GBIC and the Serial ID GBIC. The switch can identify the media type for the GBIC that is installed. Initial ExtremeWare software versions do not support Serial ID GBICs.
Page 24
Common Switch Features Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 27
Site Preparation This chapter describes how to prepare your site for installing Extreme Networks equipment. It contains information about environmental and cabling requirements, power requirements, and building and electrical code organizations. This chapter includes these sections: • Planning Your Site on page 28 •...
If you will be installing Summit “e” series switches in a stacked configuration, make sure you have the appropriate cables for the interconnections. To use the dedicated stacking ports on the back of the Summit 400 series switches, you must have a special cable that is available from Extreme Networks. Step 3: Evaluating and Meeting Cable Requirements...
United States according to the Communications Act of 1934. The FCC regulates all U.S. telephone and cable systems. The address is FCC; 1919 M Street N.W.; Washington, D.C. 20554 USA. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 30
Extreme Networks recommends that you consult an electrical contractor for commercial building and wiring specifications. Temperature. Extreme Networks equipment generates a significant amount of heat. It is essential that you provide a temperature-controlled environment for both performance and safety. Install the equipment only in a temperature- and humidity-controlled indoor area that is free of airborne materials that can conduct electricity.
Page 31
Make sure there is space around the installed switch for airflow and that cables or other equipment do not block the air intake or outflow vents on the Extreme Networks switches. It is best to have 3 to 5 inches (7.62 to 12.7 cm) of clear space in front of the air intake and outflow vents on the switches.
Page 32
38_air8 The airflow of the Alpine 3804 and Alpine 3802 moves from the left side of the chassis to the right side of the chassis as shown in Figure 2 and Figure 3. • Airflow for cooling power supplies moves left to right as you face the chassis.
Page 33
Meeting Site Requirements Figure 3: Airflow through the Alpine 3802 chassis Airflow through chassis Airflow through chassis 3802air Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 34
• Airflow for cooling modules moves left to right as you face the chassis. Figure 4: Airflow through the BlackDiamond 6816 chassis Airflow through chassis Airflow through power supplies BD_032 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 35
Figure 5: Airflow through the BlackDiamond 6808 chassis 50015 50015 Airflow through chassis POWER POWER DC OUT DC OUT AC IN AC IN 50021 50021 Airflow through power supplies BD_027 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 36
Automatic Shutdown in an Overheating Condition. The power supply controls the overheating shutdown condition in the system. The power will shut down at approximately 85° C (+/- 5° C) as reported on an independent temperature sensor within the power supply. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 37
The temperature sensor remains active when the system is in a shutdown state. System Alarms in an Overheating Condition. Extreme supports the following SNMP alarms to report overheating conditions: • Over Temperature Alarm: This trap sends notification of an overheating condition, but takes no action.
Page 38
• Use electrostatically safe equipment and the ESD straps that are provided with your equipment. All Alpine and BlackDiamond switches come with ESD wrist strap connectors and wrist straps as shown in Figure 7. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• The rack should use the universal mounting rail hole pattern that is identified in IEC Standard 297. • The mounting holes should be flush with the rails to accommodate the chassis. • Use a rack made of steel or aluminum. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 40
Use a rack grounding kit and a ground conductor that is carried back to earth or to another suitable building ground. All Extreme Networks switches are designed with mounting brackets that provide solid metal-to-metal connection to the rack. If you do not use equipment racks, you can attach wiring terminals directly to the mounting brackets for appropriate grounding.
The Summit 400 series switches also have an assigned platform weight for installed 10-gigabit dual uplink ports (Summit XEN or XGM-2xn Option Card). Table 5 lists the platform weights. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 42
Platform weight for Summit XEN option card = 2 Platform weight for the Summit 400-24 = 2 Let the supported number of slots of Summit 400-24 switches in this configuration = y Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• If only Summit 400 series switches are in the stack, stacking connections happen at the back of the switch using the Extreme Networks-specified stacking cable and the dedicated stacking ports. • Stacking Summit 200 or 300 series switches with Summit 400 series switches is not supported.
We recommend using the BICSI (Building Industry Consulting Service International) RCDD (Registered Communications Distribution Designer), which is globally recognized as a standard in site planning and cabling. For information, go to http://www.bicsi.org Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Assign a unique block of sequential numbers to the group of cables that run between each pair of wiring closets. • Assign a unique identification number to each distribution rack. • Identify all wiring closets by labeling the front panel of your Extreme Networks equipment and other hardware. • Keep accurate and current cable identification records.
Page 46
We recommend that the bend radius for fiber optic cable equals 2-inch (5.08 cm) minimum for each 90 degree turn as shown in Figure 12. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
10BASE-T Category 3 and higher UTP cable – Proprietary to Extreme Networks. Connections between two Extreme Networks 1000BASE-LX interfaces that use 10/125 µm single-mode fiber can use a maximum distance of 10,000 meters. RJ-45 Connector Jackets Use cable with RJ-45 connector jackets that are flush with the connector or that have connectors with a no-snag feature.
In areas or applications where these situations cannot be avoided, use fiber optic cabling or shielded twisted pair cabling (STP). NOTE Because harmonics can appear on the neutral line of a typical three-phase power circuit, Extreme Networks recommends using a harmonics meter in new installations. Making Network Interface Cable Connections Use the appropriate type of cable to connect the ports of your switch to another switch or router.
Site Preparation For more information about the power specifications of the Extreme Networks family of switches, see Appendix B, “Switch Technical Specifications”. Power Supply Requirements Adhere to the following requirements in order to operate your Extreme Networks equipment safely: • Make sure your equipment is placed in an area that accommodates the power consumption and component heat dissipation specifications.
• Where will the UPS be installed? • What is the maximum transition time that your installation will allow? NOTE Extreme Networks recommends that you use a UPS that provides online protection. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
This section provides information about the optical and system budgets for GBICs and mini-GBICs. Optical Budgets for Mini-GBICs The total optical system budget for the SX mini-GBIC is 11.5 dB. Extreme Networks recommends that 3 dB of the total budget be reserved for losses induced by cable splices/connectors and operating margin.
(for example, 0.25 db/km), Extreme Networks recommends that 3 dB of the total budget be reserved for losses induced by cable splices, connectors, and operating margin. Figure 14 shows the total optical system budget between long range GBICs.
Page 55
ZX Rev 03 8 dB 8 dB 8 dB 9 dB LX100 11 dB 11 dB 11 dB 12 dB The ZX mini-GBIC is equivalent to the ZX Rev 03 GBIC. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 56
Site Preparation Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Figure 16: Summit 200-24 switch rear view Power socket LC24002 Figure 17: Summit 200-24fx and Summit 200-24fx-TAA switch front view RJ-45 GBIC Console ports ports port Unit stacking LC duplex fiber connectors ID LED ES20024fx_002 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 62
The Summit 200 switch automatically adjusts to the supply voltage. The power supply operates down to 90 V. NOTE The Summit 200 switch certification and safety label is located on the bottom of the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
This LED is available only on the Summit 200-24 and 200-24fx switches. Console Port Use the console port (9-pin, “D” type connector) for connecting a terminal and carrying out local management. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Summit switch stack, see the ExtremeWare Software User Guide. NOTE Only mini-GBICs that have been certified by Extreme Networks (available from Extreme Networks) should be inserted into the mini-GBIC receptacles on the Summit 200 series switch. Summit 200 Automatic Failover The Summit 200 switch supports an automatic failover from an active fiber port to a copper backup or from an active copper port to a fiber port.
10/100 Mbps ports on the Summit 200 switch autonegotiate for half- or full-duplex operation. Summit 300 “e” Series Switches The Summit 300 “e” series switches include the following switch models: • Summit 300-24 switch • Summit 300-48 switch Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The copper port operates as an autonegotiating 10/100/1000BASE-T port. The optical port allows Gigabit Ethernet uplink connections through Extreme small form factor pluggable (SFP) gigabit interface connectors (GBICs), also known as mini-GBICs. Only one port in the combination pair can be used at one time.
Page 67
“Redundant Power Supply” on page 70. For connector pinouts, see “Pinouts for Summit 300-24 switch redundant power connector” on page 337 Summit 300-24 Switch LEDs The LED activity on the Summit 300-24 is described in Table 12. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 68
Port is enabled; link is up, device powered and activity on the blinking port. Alternating There is a power fault. amber/green The link is down or the port is disabled; non-powered device. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 69
All 10/100 Mbps ports on the Summit 300-24 switch autonegotiate for half- or full-duplex operation. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
15.4 watts power on all 24 ports simultaneously. The Extreme Networks External Power Supply 45019 (EPS-LD) is an optional external power supply that provides redundant power for the Summit 300-24 switch. For instructions to install and connect the EPS-LD, see “Installing or Removing an External Power Supply 45019 (EPS-LD)”...
There is a fault. There is no power. Fan Unit Status LEDs Color Indicates Solid Green The fan is operating normally. Solid Amber There is a fault. There is no power. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 72
Port Connections The Summit 300-48 switch uses a combination of 10BASE-T/100BASE-TX ports using RJ-45 connectors and Small Form Factor Pluggable (SFP) Gigabit Interface Connectors (GBICs), also known as mini-GBICs. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
OUT LED indicates the condition of the output DC power supplied by the power supply to the switch. When the output power is satisfactory the OUT LED is green, otherwise it is off. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Hardware determines when a link is lost and swaps the primary and redundant ports to maintain stability. After a failover occurs, the switch keeps or sticks with the current port assignment until there Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
802.3af specification. The Summit 400-24 switch also has four fiber ports that allow Gigabit Ethernet uplink connections through Extreme 1000BASE-SX, 1000BASE-LX, or 1000BASE-ZX SFP mini-GBICs using LC connectors. The four fiber ports and the last four of the 10/100/1000BASE-T ports are designed as shared, or combination, ports for uplink redundancy.
Page 76
Figure 28 shows the rear view of the Summit 400-24t switch. Figure 29 shows the rear view of the Summit 400-24p switch. Figure 28: Summit 400-24t switch rear view External power supply connection 10 Gigabit Power socket stacking ports ES4K035A Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 77
The Summit 400-24 switch comes with an internal power supply and can be connected to the Extreme External Power Supply tray. The status of the internal power supply is indicated by the PSU-I LED. The status of the external power supply is indicated by the PSU-E LED.
Page 78
Color Indicates Green, solid The link is present; port is enabled. Green, blinking The link is present and the port is transmitting or receiving packets. The link is not present. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 79
The Summit 400-24 switch has 24 copper 10/100/1000BASE-T ports using RJ-45 connectors for communicating with end stations and other devices over 10/100/1000 Mbps Ethernet. The switch also has four fiber ports that allow Gigabit Ethernet uplink connections through Extreme 1000BASE-SX, 1000BASE-LX, or 1000BASE-SX SFP mini-GBICs using LC connectors.
44.0 mm) that provides 48 autosensing 10/100/1000BASE-T ports using RJ-45 connectors. The switch also has four fiber ports that allow Gigabit Ethernet uplink connections through Extreme 1000BASE-SX, 1000BASE-LX, or 1000BASE-ZX SFP mini-GBICs using LC connectors. The four fiber ports and the first four of the 10/100/1000BASE-T ports are designed as shared, or combination ports for uplink redundancy.
Page 81
• Console Port—Use the console port (9-pin, “D” type connector) to attach a terminal and access the CLI through a serial connection. Use the console port to carry out local management. Figure 32 shows the rear panel of the Summit 400-48t switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 82
The FAN LED indicates the status of the cooling fans. • Power The Summit 400-48t comes with an internal power supply and can be connected to the Extreme External Power Supply tray. The status of the internal power supply is indicated by the PSU-I LED.
Page 83
The internal power supply has no power. PSU-E Color Indicates Green, solid The external power supply is operating normally. The external power supply is not connected. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit 400-48t switch has 48 copper 10/100/1000BASE-T ports using RJ-45 connectors for communicating with end stations and other devices over 10/100/1000 Mbps Ethernet. The switch also has four fiber ports that allow Gigabit Ethernet uplink connections through Extreme 1000BASE-SX, 1000BASE-LX, or 1000BASE-SX SFP mini-GBICs using LC connectors.
VLAN and attempts to route traffic through it. Extreme Networks does not recommend that you use the management port to route traffic to any front panel port on the switch. The management port is designed only for switch management purposes.
EPS system with only one power supply. Each EPS-160 ships with an AC cord for use in the USA and a special redundant power supply cable. Refer to the Extreme website or talk to your local sales representative for a list of compatible Extreme switches.
The front panel of each Summit1i switch includes LEDs, six fixed 100/1000 Mbps or 1000 Mbps ports, and two unpopulated ports for installation of GBICs with SC connectors. Figure 37 shows the rear panel of both available Summit1i switch models. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Summit1i switch. If one of the power sources or power supplies fails, the second power supply provides all power needs, ensuring uninterrupted network operation. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Serial numbers that start with 0233 and lower have MT-RJ connectors. Serial numbers that start with 0234 and higher have LC connectors. For example, a Summit5iLX switch with the serial number 0234M-00012 has LC connectors. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 91
The front panel of each Summit5i switch includes LEDs, 12 fixed 100BASE-TX/1000BASE-T, 1000BASE-SX, or 1000BASE-LX ports, and 4 unpopulated ports for installation of GBICs with SC connectors. Figure 41 shows the rear view of the Summit5i switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit5i switch has built-in dual redundant power supplies. Each power supply has its own power socket. When the second power supply is connected to a second independent power source, both Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• 28 autosensing 100BASE-TX/1000BASE-T ports with RJ-45 connectors and 4 1000BASE-X ports with SC connectors (Figure 42) • 28 1000BASE-SX ports with MT-RJ connectors and 4 1000BASE-SX ports with SC connectors (Figure 43) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 94
Summit7i switch has a reset button, serial console port, modem port, Ethernet management port, and PCM/CIA slot. Figure 44 shows the rear view of both available Summit7i switch models. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• UTP GBIC For more information about the supported GBIC types, see “GBIC Type and Hardware/Software Support” on page 23. For specifications of individual GBIC models, see “GBIC Specifications” on page 340. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Serial number—Manufacturing serial number for this device. Refer to the serial number when you contact Extreme Networks technical support • MAC address—Unique Ethernet MAC address assigned to this device. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Frames are being transmitted. Link is not present. Summit48i Switch The Summit48i switch is 2U high. It has 48 autosensing 10BASE-T/100BASE-TX ports and 4 1000BASE-X ports with SC connectors (Figure 45). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit48i switch has four unpopulated ports for installing GBICS with SC connectors. These four ports provide two Gigabit Ethernet ports and two redundant Gigabit Ethernet ports. You can use the following GBICs in the Summit48i switch: Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Use a non-conductive tool to push the reset button. Console Port Use the console port (9-pin, “D” type connector) for local management. This port allows you to attach a terminal and access the CLI via a serial connection. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Figure 48: LEDs and ports on the Summit48si switch Console Mini-GBIC port port status LEDs 10/100 Mbps ports with status LEDs Mini-GBIC ports 48si_dtl Figure 49 shows the rear panel of the Summit48si switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 101
The label that indicates country and safety certifications for the Summit48si switch is located on the bottom of the switch (Figure 50). Figure 50: System labels on the Summit48si switch Label Label 48i1_btm Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit48si switch has the following LEDs: • Management • Port status For information about the LEDs and their activity on the Summit48si switch, see “Summit48si Switch LEDs” on page 105. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit48si switch supports two hot-insert power supplies, either AC, shown in Figure 51, or DC, shown in Figure 52, with one power supply preinstalled at the factory. Extreme Networks recommends upgrading to ExtremeWare v7.1 or later to use the following features: •...
• Model number—Shows the model number assigned to this device • Part number—Shows the part number assigned to this device • Serial number—Refer to the serial number when you contact Extreme Networks technical support • MAC address—Shows the unique Ethernet MAC address assigned to this device...
Input voltage is not present DC in Green Input voltage is within range Input voltage is not applied, DC input voltage is not within specification, or input fuse is burned out Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 106
Summit Switch Models Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Redundant DC power supply for the Summit48si 3 Connect power cables to the switch. If there is a power switch, move it to the on position. 4 Verify successful installation (page 114). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit7i switch can weigh up to 55 pounds (24.9 kg). NOTE Only the Summit7i switch uses the helper bracket. The helper bracket is not required to rack mount a Summit1i, Summit5i, Summit48i, or Summit48si switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 109
4 Remove the existing screws from the sides of the case (retain the screws for Step 6). 5 Place a mounting bracket over the mounting holes on one side of the unit. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 110
6 Insert and tighten the screws using a suitable screwdriver, as shown in Figure 54 and Figure 55. Figure 54: An example of fitting the mounting bracket into the switch EW_rack Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 111
To turn on power to a Summit 300-48 switch, connect all power cables between the switch and the AC power source. Then turn all power switches to the ON position. NOTE Only the Summit 300-48 switches have on/off switches. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Figure 56 shows a typical stacked configuration using Summit 400 series switches, and figure shows a typical stacked configuration using Summit 200 and 300 series switches. Figure 56: Typical Summit 400 series stacked configuration EW75001 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 113
Summit 400-24t/24p Stacking ports 25, 26 on the back, or any Gigabit Ethernet port on the front Summit 400-48t Stacking ports 52, 53 on the back, or any Gigabit Ethernet port on the front Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Connecting Summit 400 Series Switches The dedicated stacking ports on the back of a Summit 400 series switch require a specific stacking cable that is available from Extreme Networks. To connect the stacking ports on two Summit 400 series switches, follow these steps: 1 Align the stacking cable connector with a stacking port on one switch.
5 Have a minimum of two people carefully remove the chassis from the rack and place it on a secure, flat surface with the front of the chassis facing you. 6 Unscrew the helper bracket and remove it from the rack. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 116
Summit Switch Installation Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Read the information in this chapter thoroughly before you attempt to install or remove any of the Summit power supplies. CAUTION Use of controls or adjustments of performance or procedures other than those specified herein can Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
10 feet or less and at least 16-gauge copper wire. CAUTION Only trained service personnel should install or remove the Extreme EPS-LD unit, in accordance with the installation instructions. Before servicing this system, please read the safety information provided in Appendix A.
If you mount the EPS-LD with the connectors facing in the opposite direction as the Extreme switch connector, leave at least 1 U between the switch and the EPS-LD through which to slide the cables. Do not route the cables around the equipment rack.
See Figure 60 to locate the connectors on the EPS-LD unit and on the switch. 2 Align and tighten the captive retaining screws on the connector. 3 Connect the other end of the EPS-LD cable to the Extreme switch. The connector fits in only one direction.
1 Disconnect the AC power by removing the plug from the wall. 2 Disconnect the AC power cord from the EPS-LD unit. 3 Disconnect the cable between the Extreme switch and the EPS-LD unit. 4 Remove the screws from the EPS-LD mounting brackets.
Do not turn on the power to the power supply unless the power supply is installed in the switch. 7 Set the power supply switch to the ON position. 8 Keep the cover plate and power supply packaging for future use. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
6 Hold the retaining screws, and use them to slowly pull the power supply toward you, as shown in Figure 62. WARNING! Do not insert your fingers or hands into the empty power supply bay. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Installing an External Power System for a Summit 400 Switch The Extreme External Power System (EPS) allows you to add a redundant power supply to the Summit 400 switch to protect against a power supply failure. It consists of a tray (EPS-T) that holds one or two EPS-160 power supplies.
See Figure 64 for details on the connector key and Figure 65 to locate the connectors on the EPS-160 and the switch. For wire-to-pin connections for the connector on the rear panel of the EPS-160, see “Power Connector Specifications” on page 337. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
ES4K021A 8 Connect the other end of each EPS-160 power supply cable to the Extreme switch. This connector end can only be inserted into the switch with the end marked TOP facing up. 9 Connect the supplied AC cable to the AC supply for each unit.
Do not plug in the power cable into the power supply unless the power supply is installed in the switch. 5 Keep the faceplate and the power supply packaging for future use. Removing a Summit 48si AC Power Supply To remove a Summit48si AC power supply: Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The retaining brackets make it less likely that a power supply cable will be inadvertently knocked loose from a power supply. To install a power cable retaining bracket: Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 129
5 Connect the power cable to the switch CAUTION Do not connect the power cable to the power source at this time. Figure 68: Attaching the retaining bracket directly Retaining bracket screw LB48021B Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 130
Figure 68. • For power supplies without permanently attached standoffs, use the supplied spacers between the bracket and the power supply, as shown in Figure 69. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 131
7 Tighten the retaining bracket screw to secure the bracket around the power connector. 8 Connect the power cable to the power source. 9 If the switch has a power switch, set the power switch to the ON position. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Summit48si DC power supplies slide in from the rear of the switch. The front of the power supply provides a handle for inserting and removing the power supply from the chassis. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 133
CAUTION Do not slam the power supply into the backplane. This or other excessive force will cause damage and possibly require the return of the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Summit48si system without further electrician assistance. Figure 74: Three-wire Cable Harness EWUG005 For the wire-to-pin connection specifications, see “Wire-to-pin connection specifications for the Summit 48si DC power cable” on page 337. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
4 inches apart with the first one located within 6 inches of the terminal block. NOTE It is not necessary to switch off power from the source when removing the keyed connector from the Summit48si DC power supply. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 136
Installing and Connecting Summit Power Supplies Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Please note that the Switch Management Module in the Alpine 3803 or 3804 is hot-swappable and user removable, but the Alpine 3802 has an integrated management module that is not hot-swappable or user removable. For the specifics of each chassis, see the individual switch descriptions.
• AC —Auto-sense for 110 and 220 VAC power • DC—Requires -48 VDC nominal input line voltage If two power supplies are installed in the switch, both installed power supplies must be of the same type. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1 All installation, maintenance, and removal of a power supply must be done by qualified, trained service personnel only. 2 If you have one AC power supply installed in the Alpine 3802 switch, it must be installed in the lower power supply tray (PSU A).
Alpine 3800 Series Switch Models Fans The Alpine 3808 and 3804 switches have hot-swappable fan trays. The Alpine 3802 has built-in fans that are not designed to be replaced by customers. ExtremeWare monitors the fan trays in the Alpine 3800 series switches for failure and overheat conditions.
Page 143
100-120 THIS 3804 INSTALLED WHEN wrist strap DC OK connector Fan tray SMMi module slot I/O module slots 38_3808 Figure 76 shows the rear view of the Alpine 3808 switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• One or two power supplies, accessed from the rear of the unit • One hot-swappable fan tray containing three fan units, accessible from the front of the switch • One electrostatic discharge (ESD) wrist strap connector Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 145
Figure 77: Front view of the Alpine 3804 switch with typical I/O modules installed wrist strap connector Fan tray SMMi module slot I/O module slots 38_3804 Figure 78 shows the rear view of the Alpine 3804 switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Six light emitting diodes (LEDs) CAUTION The Alpine 3802 switch has an integrated Switch Management Module (SMMi). The integrated Switch Management Module is not hot-swappable or user removable. Do not attempt to remove the integrated Switch Management Module. Contact Extreme Networks Customer Support if you experience problems.
Page 147
Alpine 3802 Switch The Alpine 3802 switch can support up to the following number of ports and types of port configurations: • 64 switched 10BASE-T/100BASE-TX Ethernet ports • 48 switched 100BASE-FX Fast Ethernet ports • 8 switched Gigabit Ethernet ports •...
Alpine 3800 Series Switch Models NOTE Slot 3 in the Alpine 3802 accepts only Alpine Access I/O modules (silver stripe). You cannot insert an Alpine Ethernet I/O module (green stripe) into slot 3. For more information about this command, see the ExtremeWare Command Reference Guide and the ExtremeWare Software User Guide.
Page 149
NOTE Do not attempt to repair a failed power supply; power supplies are not user-removable. Alpine 3802 switch power supplies must be installed or removed only by trained service personnel. Contact Extreme Networks Customer Support if you experience problems.
Page 150
Alpine 3800 Series Switch Models Figure 81: Rear view of the Alpine 3802 switch with dual DC power supplies Grounding On/Off Input terminal studs Label switches blocks 3802rear_DC The rear panel of the Alpine 3802 DC switch provides: • Access to the grounding studs •...
Safety Information WARNING! Read the safety information in Appendix A thoroughly before installing your Extreme Networks switch. Failure to follow this safety information can lead to personal injury or damage to the equipment. • Only trained service personnel should perform service to components of an Alpine 3800 series switch.
• For an Alpine 3808 or 3804, a minimum of eight appropriate screws (not provided) to secure the chassis to the rack • For an Alpine 3802, a minimum of four appropriate screws (not provided) to secure the chassis to the rack...
Page 153
5 While holding the empty chassis, secure it with four or eight suitable screws, depending on the model. • Alpine 3808—eight screws (Figure 84) • Alpine 3804—eight screws (Figure 85) • Alpine 3802—four screws (Figure 86) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 154
Alpine 3800 Series Chassis Installation Figure 84: Alpine 3808 chassis with eight mounting screws Helper bracket 38_rack8 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Figure 85: Alpine 3804 chassis with eight mounting screws Helper bracket 38_rack4 Figure 86: Alpine 3802 chassis with four mounting screws Helper bracket 3802rack 6 After you secure the chassis, remove the helper bracket. Store it for future use, in case you need to remove the chassis.
• I/O modules from the Alpine 3802 For information about removing power supplies, see Chapter 8. For information about removing the SMMi, see Chapter 9. For information about removing I/O modules, see Chapter 10. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 157
5 Have a minimum of two people gently remove the chassis from the rack and place it on a secure, flat surface with the front of the chassis facing you. 6 Unscrew the helper bracket and remove it from the rack. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 158
Alpine 3800 Series Chassis Installation Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 159
• Installing an Alpine 3808 or Alpine 3804 AC Power Supply on page 160 • Installing an Alpine 3808 or Alpine 3804 DC Power Supply on page 163 • Supplying Power to the Alpine 3802 DC Power Supply on page 167 • Verifying Successful Power Installation on page 168 •...
NOTE If you require DC power supplies in the Alpine 3802 switch, two power supplies must be installed. The Alpine 3802 switch does not support a DC power configuration using only a single power supply. Installing an Alpine 3808 or Alpine 3804...
Page 161
Safety lever Handle latch SERVICE 45012 WHEN INSTALLED IN 3808 THIS WAY UP SLIDE TO REMOVE wrist strap 100-120 200-240 200-240 connector 100-120 THIS 3804 INSTALLED WHEN DC OK 38_pwrx8 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 162
To install an additional power supply, repeat steps 1 through 7. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1 Strip 0.5 inch (1.27 cm) of insulation from the appropriate AWG, high-strand-count copper cable. 2 Insert the cable into the cable lug. 3 Using a 1/4-inch or 5/16-inch screwdriver, tighten the cable retention screw to 20 inch-pounds of torque. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Use the text on the front of the power supply to ensure that it is oriented correctly for either the Alpine 3808 or Alpine 3804. • Open the ejector/injector lever. • Move the safety latch to the “remove” position. • Place the On/Off switch in the “off” position. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 165
4 Use the central handle to guide the power supply into the bay while supporting the supply from the bottom with your other hand. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
4 Place the DC ground and power cable lugs over the studs on the power supply, as shown in Figure 91 and Figure 92. Figure 91: Alpine 3808 DC power supply with cables 45022 SLIDE TO REMOVE -48V WHEN 45022 38_lugs8 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
ESD-sensitive components. Supplying Power to the Alpine 3802 DC Power Supply The Alpine 3802 switch supports two DC power supplies that come preinstalled from the factory. To power on the Alpine 3802 DC power supplies, complete the following tasks: •...
Attaching the Cables and Supplying Power After you install the Alpine 3802, you must attach the cables that supply power to the chassis. To attach the cable to the lugs, and then to the DC power supply, perform the following steps: 1 Attach the ESD strap to your wrist and connect the metal end of the ESD strap to the ground receptacle on the top right corner of the switch front panel.
7 If you are going to install a replacement power supply, follow the installation steps on page 160. 8 If there is a problem with the power supply that you removed, contact Extreme Networks for assistance.
11 If you are going to install a replacement power supply, follow the installation steps on page 163. 12 If there is a problem with the power supply that you removed, contact Extreme Networks for assistance.
10 feet (3.05 m) and at least 16-gauge copper wire. The cables connecting the power supply to the Extreme switch or module are purchased separately; contact your Extreme sales representative to purchase the cables. For more information, see “Connecting the EPS-LD to the FM-32Pi Module”...
If you mount the EPS-LD with the connectors facing in the opposite direction from the Extreme switch connector, leave at least 1 U between the switch and the EPS-LD through which to slide the cables. Do not route the cables around the equipment rack.
Page 173
EPSLD01 NOTE Only trained service personnel should install or remove the Extreme EPS-LD unit, in accordance with the installation instructions. Before servicing this system, please read the safety information provided in Appendix A. Not following these precautions can result in equipment damage or shock.
1 Disconnect the AC power by removing the plug from the wall. 2 Disconnect the AC power cord from the EPS-LD unit. 3 Remove the cable that connects to the Extreme switch from the EPS-LD unit. 4 Loosen the thumbscrews on the front of the EPS-LD mounting racks.
Page 175
Alpine 3804 switch requires an installed SMMi. NOTE The Alpine 3802 switch does not require a separate Switch Management Module. All upper-layer protocol processing and switch management functions are part of the integrated Switch Management Module that is in the chassis.
The SMMi has two 144-pin SODIMM sockets, and ships with two 128 MB SODRAM modules installed, as shown in Figure 98. NOTE The SMMi supports only the SODIMMs that are supplied by Extreme Networks. Figure 98: SMMi SODIMM sockets 38_SODMs SMMi LEDs Table 34 describes the LED activity on the SMMi.
7 Slide the module into the top slot of the chassis, until it makes contact with the backplane. NOTE Use the metal panel, not the PCB, to guide the SMMi. As the module begins to seat in the chassis, the ejector/injector levers begin to close. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
4 Slide the module out of the chassis. Hold the module front panel with one hand, and place your other hand under the metal panel to support the module. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 179
6 Install a replacement SMMi, following the installation procedure described on page 177. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 180
Alpine 3800 Series Switch Management Module Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
I/O modules. The default configuration allows the I/O module ports to participate in the VLAN named default. The default configuration for the I/O module is not preserved unless you explicitly save the information to nonvolatile RAM (NVRAM). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 182
If you pre-configure a slot for a specific module type, and then insert a different type of module, the module reverts to its default configuration. NOTE See the ExtremeWare Software User Guide and the ExtremeWare Command Reference Guide for more information about configuring I/O modules. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The GM-4Ti module has the following LEDs: • Module status • Port status • Port speed For information about the LEDs and their activity on the GM-4Ti module, see “I/O Module LEDs” on page 202. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Install two or fewer LX100 GBICs per GM-4Xi module and install any combination of the following GBICs in the empty slots: — 1000BASE-SX — 1000BASE-LX — ZX GBIC — ZX Rev 03 — LX70 — UTP GBIC Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 185
The GM-4Xi module has the following LEDs: • Module status • Port status For information about the LEDs and their activity on the GM-4Xi module, see “I/O Module LEDs” on page 202. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The GM-4Si module has the following LEDs: • Module status • Port status For information about the LEDs and their activity on the GM-4Si module, see “I/O Module LEDs” on page 202. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Alpine chassis. Table 36: GM-16X configurations supported Chassis GM-16X Modules Alpine 3802 1 (or 1 GM-16T module), installed in slot 1 or slot 2 only Alpine 3804 Alpine 3808 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 188
For information about the LEDs and their activity on the GM-16X module, see “I/O Module LEDs” on page 202. Software Requirements The GM-16X module requires ExtremeWare version 7.0.1b11 or later and BootROM 7.8 or later on the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 189
Alpine chassis. Table 39: GM-16T configurations supported Chassis GM-16T Modules Alpine 3802 1 (or 1 GM-16X module), installed in slot 1 or slot 2 only Alpine 3804 Alpine 3808 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 190
For information about the LEDs and their activity on the GM-16T module, see “I/O Module LEDs” on page 202. Software Requirements The GM-16T module requires ExtremeWare version 7.0.1b11 or later and BootROM 7.8 or later on the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Inherit the properties of the default VLAN (protocol type, VLANid, and so forth). • Operate in autonegotiation mode. LEDs The FM-24Ti module has the following LEDs: • Module status • Port status Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 192
For information about the LEDs and their activity on the FM-24Ti module, see “I/O Module LEDs” on page 202. Software Requirements The FM-24Ti module requires ExtremeWare version 6.1.7 or later and BootROM 6.5 or later on the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
For information about the LEDs and their activity on the FM-24SFi module, see “I/O Module LEDs” on page 202. Software Requirements The FM-24SFi module requires ExtremeWare version 6.1.7 or later and BootROM 6.5 or later on the switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
For information about the LEDs and their activity on the FM-24MFi module, see “I/O Module LEDs” on page 202. Software Requirements The SMMi requires ExtremeWare version 6.1.5 or later to operate the FM-24MFi. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The FM-32Ti module has the following LEDs: • Module status • Port status For information about the LEDs and their activity on the FM-32Ti module, see “I/O Module LEDs” on page 202. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
(4.0W, class 1). There is no limitation to the number of modules installed, but ExtremeWare enforces a limit on the number of ports powered up per module and per system. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 197
For information about the LEDs and their activity on the FM-32Pi module, see “I/O Module LEDs” on page 202. Software requirements The FM-32Pi module requires ExtremeWare version 7.2 or later. For more information about software requirements, see the ExtremeWare Release Notes. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The FM-8Vi module requires that the SMMi has ExtremeWare version 6.1.5 or later and BootROM 6.5 or later. For more information about software requirements and module configuration, see the ExtremeWare Release Notes Software Version 6.1.5w2.01 Rev1. The FM-8Vi module also requires a Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 199
VDSL statistics. To display VDSL statistics, use the following command: show port <portlist> vdsl stats The following command displays the VDSL statistics for ports 2:1 through 2:4: show port 2:1-2:4 vdsl stats Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The WM-4T1i module requires ExtremeWare version 6.1.5 or later and BootROM 6.5 or later on the switch. For more information about software requirements and WM-4T1i module configuration, see the ExtremeWare Software User Guide and the ExtremeWare Command Reference Guide. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The WM-4E1i module requires ExtremeWare version 6.1.5 or later and BootROM 6.5 or later. For more information about software requirements and WM-4E1i module configuration, see the ExtremeWare Software User Guide and the ExtremeWare Command Reference Guide. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Table 40 describes the LED activity on the Alpine I/O modules with the green stripe (for example, the GM-4Ti, GM-4Xi, and FM-24MFi I/O modules). Table 40: Alpine I/O module LEDs (green stripe) Color Indicates Status Green Normal operation Amber Disabled No power Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 203
Table 42 describes the system LED activity on the Alpine PoE modules (for example, the FM32Pi I/O module). Both system and per-port LEDs are present on the module under software control. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
SMMi modules only. I/O modules do not fit in the top slot of the Alpine 3808 or the Alpine 3804 chassis. Forceful insertion can damage the I/O module. 3 Remove the blank faceplate from the slot to make room for the module, if necessary. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
After you install an I/O module, verify that it is working correctly. Check the LEDs on the I/O module and use the command to display slot-specific information about the newly show slot <slot number> installed module. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The Extreme Networks External Power Supply 45019 (EPS-LD) provides additional power to compatible Power over Ethernet (PoE) modules and other Extreme switches. The EPS-LD provides 465 W total power with 375 W dedicated for PoE applications. See the section that describes the connected device to determine total available power to PoE ports.
Page 207
To remove additional modules, repeat steps 2 through 6. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 208
Alpine 3800 Series I/O Modules Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Read the information in this chapter thoroughly before you attempt to install or remove any Alpine fan tray. The fan tray in the Alpine 3802 is not designed to be replaced by customers. Contact Extreme Networks if there is a fan failure in the Alpine 3802.
Page 210
6 Immediately install a replacement fan tray, as described in “Installing the Alpine 3808 or Alpine 3804 Fan Tray” on page 211. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
4 Using the # 1 Phillips screwdriver, align and tighten the retaining screws to secure the fan tray, to the chassis. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 212
Replacing the Alpine 3800 Series Switch Fan Tray Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
MSM64i. The features of the BlackDiamond 6800 series switches include: • Hot-swappable I/O modules and MSMs • Redundant, load-sharing, hot-swappable power supplies • Field-replaceable, hot-swappable fan tray Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
BlackDiamond 6816 and install four MSMs, each module receives two of the eight Gigabit Ethernet links. If you have a BlackDiamond 6808 or a BlackDiamond 6804 and install two MSMs, each module receives four of the eight Gigabit Ethernet links. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Ethernet I/O module also installed in the chassis in order to operate correctly. Figure 118 shows the front view of the BlackDiamond 6816 chassis, fully populated with 4 MSMs and 16 I/O modules. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 219
The front of the BlackDiamond switch provides the ESD wrist strap connector, slots for installing MSMs and I/O modules, power supply bays, and access to the fan trays (Figure 119). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 220
Figure 119: BlackDiamond 6816 fan tray Turn screw heads clockwise to lock & counter-clockwise to unlock fan tray Hand grip Direction of airflow BD_031 Figure 120 shows the rear view of the BlackDiamond 6816 switch. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 221
The back panel of the BlackDiamond 6816 switch provides: • Chassis grounding studs • System label that includes: — Chassis serial number — Ethernet MAC address of the switch — Symbols of safety certification Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Ethernet I/O module also installed in the chassis in order to operate correctly. Figure 121 shows the front view of the BlackDiamond 6808 chassis fully populated with two MSMs and ten I/O modules. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 223
V-50/60Hz V-50/60Hz 200-240V, 15A 200-240V, 15A BD_6808 The front of the BlackDiamond switch provides the ESD wrist strap connector, slots for installing MSMs and I/O modules, and power supply bays. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 224
• Access to the fan tray (Figure 123) • Chassis grounding studs • System label that includes: — Chassis serial number — Ethernet MAC address of the switch — Symbols of safety certification Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 226
6804chas The front of the BlackDiamond switch provides the ESD wrist strap connector, slots for installing MSMs and I/O modules, power supplies, and access to the fan tray (Figure 125). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 227
Hand grip Direction of airflow XM_030 Figure 126 shows the rear view of the BlackDiamond 6804 switch. Figure 126: Rear view of the BlackDiamond 6804 switch Label Grounding studs 6804_rr Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Number of PSUs Switch Model Installed BlackDiamond 6816 BlackDiamond 6808 BlackDiamond 6804 NOTE If you install four power supplies in a BlackDiamond 6816 chassis, the power supplies will deliver full redundancy. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 229
Figure 127: 220 VAC power supplies in a BlackDiamond 6808 or a BlackDiamond 6804 POWER DC OUT AC IN POWER 50021 DC OUT AC IN 50021 BD_028 Table 46 describes the LED activity on the 220 VAC power supply Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Table 47: 110 VAC power supply LED activity Color Indicates AC In Green Powered using both inputs Amber Powered using only one input, or input voltage is less than 100 V No input power Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
DC OUT DC IN 50022 -48V SINGLE DC PSU -48V RET -48V -48V RET 48V, 60A 48V, 60A BD_DCpsx Table 48 describes the LED activity on the DC power supply Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 232
Input voltage is outside of range Input voltage is below 12 V DC out Green All DC outputs are operational Amber One or more DC outputs have failed Input voltage is below 12 V Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Safety Information WARNING! Read the safety information in Appendix A thoroughly before installing your Extreme Networks switch. Failure to follow this safety information can lead to personal injury or damage to the equipment. • Only trained service personnel should perform service procedures on Extreme Networks switches and components.
57 to 140 pounds, depending on the model. For your safety and to prevent damage to the equipment, Extreme Networks strongly recommends that you mount the chassis in the rack as shipped, before you install modules and power supplies. The increased weight of the chassis after components are installed can make the switch hard to maneuver.
Page 235
4 Have a minimum of two people lift and place the empty chassis on the helper bracket and slowly guide the chassis into the rack. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 236
5 While holding the empty chassis, secure it with a minimum of eight suitable screws. • BlackDiamond 6816—see Figure 131 • BlackDiamond 6808—see Figure 132 • BlackDiamond 6804—see Figure 133 Figure 131: Securing the BlackDiamond 6816 chassis to a rack BD_rack16 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 237
Installing the Chassis Figure 132: Securing the BlackDiamond 6808 chassis to a rack BD_rack08 Figure 133: Securing the BlackDiamond 6804 chassis in a rack 6804rack Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• A minimum of four appropriate screws to secure the helper bracket (not provided) • # 1 Phillips screwdriver • A minimum of two people to help remove the chassis from the rack Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 239
5 Have a minimum of two people carefully remove the chassis from the rack and place it on a secure, flat surface. 6 Unscrew the helper bracket and remove it from the rack. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 240
Installing a BlackDiamond 6800 Series Switch Chassis Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
You need the following tools and equipment to install the BlackDiamond 6800 series AC power supplies: • ESD-preventive wrist strap • # 1 Phillips screwdriver CAUTION The power supply weighs approximately 30 pounds (14 kg). Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 242
— Power supply right side up, with the retaining screws at the bottom — Locking handle to the right Figure 134: Orientation of the DC power supply in a BlackDiamond 6816 BD_034 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
2 Verify that the rack and chassis are grounded to protective earth ground. 3 If a blank faceplate is covering the power supply bay, remove it and save it for future use. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Use the appropriate AC power cable and plug for your switch and your location. See “Wiring Closet Considerations” on page 30 for more information about the types of power cords to use. Figure 138 shows the BlackDiamond 6800 series 220 VAC power cable and plug. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
See Chapter 15, “BlackDiamond 6800 Series Management Switch Fabric Module” for more information about switch management module LED activity and Chapter 16, “BlackDiamond 6800 Series I/O Modules” for more information about I/O module LED activity. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
3 Disconnect the power supply cable(s) from the wall outlet and then from the power supply. 4 Unscrew the retaining screws using a #1 Phillips screwdriver. 5 Rotate the locking handle outward to disengage the power supply from the backplane. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 247
Figure 140: Removing BlackDiamond 6816 AC power supplies BD_029 Figure 141: Removing BlackDiamond 6808 or BlackDiamond 6804 220 VAC power supplies POWER DC OUT AC IN POWER 50021 DC OUT AC IN 50021 BD_028 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
0.625 inch (15.86 mm) apart. NOTE Add a length of heat-shrink tubing to prevent the crimp area on the lug from coming into contact with the metal faceplate of the DC power supply. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Each set of power terminals on the DC power supply consists of two 6-mm, metric-threaded, nickel-plated, brass studs centered 0.625 inch apart. The earth ground studs extend 0.52 inch (13.2 mm) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
After you supply power to the BlackDiamond switch, each MSM performs a POST of its circuitry. The LED labeled “SYS” on the MSM blinks amber during the POST. After the MSM has passed its POST and is operational, each I/O module performs its own POST. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
7 Replace the plexiglass cover. 8 Unscrew the retaining screws using a #1 Phillips screwdriver. 9 Rotate the handle outward to disengage the power supply from the backplane. as shown in Figure 144. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 252
Install a replacement power supply following the instructions in “Installing a BlackDiamond 6800 Series DC Power Supply” on page 248. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Two MSMs in the BlackDiamond 6804 switch With full redundancy, the BlackDiamond 6800 series switch is a fully nonblocking switch. Table 52 shows that packet throughput between I/O modules increases when additional MSMs are installed. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 254
Module status LEDs 50015 Module reset button CONSOLE Console port MODEM Modem port MGMT Management port LINK / ACTIVITY PCMCIA slot PCMCIA EW_MSM64i Figure 146 shows the front view of the MSM-3. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The master MSM is responsible for upper-layer protocol processing and system management functions. For example, OSPF computation and SNMP functions are performed by the master MSM. Packet handling is distributed among the CPUs of all installed MSMs. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The MSM has two 144-pin SODIMM sockets and is shipped with two 128 MB SODRAM modules installed, as shown in Figure 147. NOTE The MSM supports only SODIMMs supplied by Extreme Networks. Figure 147: MSM SODIMM sockets EW_SODMs Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
If you continue to have critical software errors, or the ERR LED is amber after the command and a switch reboot, contact Extreme Networks Customer Support. clear log static Installing MSMs The BlackDiamond MSM is hot-swappable. You do not need to power off the system to insert an MSM.
Page 258
Figure 148: MSM before insertion in a BlackDiamond 6816 or a BlackDiamond 6804 EW_clips2 For the BlackDiamond 6808: • The MSM is vertical as shown in Figure 149. • The module name is at the top. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 259
To secure the module, tighten the two screws with a #1 Phillips screwdriver. NOTE Tighten the screws of this module before you insert additional modules. Otherwise, you might unseat modules that you have not secured. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The BlackDiamond MSM is hot-swappable. You do not need to power off the system to remove a module. You need the following tools and equipment to replace an MSM: • ESD-preventive wrist strap • # 1 Phillips screwdriver • Replacement MSM Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 261
To remove additional MSMs, repeat steps 2 through 5. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 262
BlackDiamond 6800 Series Management Switch Fabric Module Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The pre-configured information is applied to the module after it is inserted. If you pre-configure a slot for a specific module type, and then insert a different type of module, the module reverts to its default configuration. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
— Supported by current management modules — Compatible with all BlackDiamond I/O modules • Hot-swappable • 802.3x Flow Control Generation (on transmit to throttle receive traffic) • Up to 16 gigabit full-duplex bandwidth Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 265
293. Software Requirements The BlackDiamond MSM requires both BootROM 8.1 (or later) and the final release build of ExtremeWare 7.2 (or later) in order to recognize the 10GX I/O module. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The G8Ti module has the following LEDs: • Module status • Port status • Port speed For information about the LEDs and their activity on the G8Ti module, see “I/O Module LEDs” on page 293. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
The G8Xi module supports any of the following GBICs: • 1000BASE-SX • 1000BASE-LX • 1000BASE-LX70 • ZX GBIC • LX100 GBIC • UTP GBIC Table 54 describes the media types and associated maximum distances for each GBIC type. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 268
(1550 nm optical window) Category 5 UTP cable – *Extreme Networks proprietary. Connections between two Extreme Networks 1000BASE-LX interfaces can use a maximum distance of 10,000 meters. NOTE For more information about the supported GBIC types, see “GBIC Specifications” on page 340.
For information about the LEDs and their activity on the G12SXi module, see “I/O Module LEDs” on page 293. Software Requirements The G12SXi module requires ExtremeWare version 6.1.4 or later. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 270
11, 12 13, 14 15, 16 Populate ports 1, 3, 5, 7, 9, 11, 13, and 15 first; then populate ports 2, 4, 6, 8, 10, 12, 14, and 16. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
ExtremeWare version 7.0.1b11 or later and BootROM 7.8 or later. Hardware Requirements Extreme Networks recommends using iPower power supplies (part numbers 50020, 50021, 50022) with F96Ti modules in a BlackDiamond 6800 chassis. A BlackDiamond 6800 chassis with the original power...
Page 272
Table 57: G16X modules supported Chassis Power Supply G16X Module BlackDiamond 6804 BlackDiamond 6808 original power supplies BlackDiamond 6808 iPower power supplies BlackDiamond 6816 iPower power supplies Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 273
Populate ports 1, 5, 9, 13, 17, and 21 first; then, ports 2, 6, 10, 14, 18, and 22. then, ports 3, 7, 11, 15, 19, and 23; and finally, ports 4, 8, 12, 16, 20, and 24. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Hardware Requirements Extreme Networks recommends using iPower version power supplies (part numbers 50020, 50021, 50022) with F96Ti modules in a BlackDiamond 6800 chassis. A BlackDiamond 6800 chassis with the original power supplies (part number 50012) will power fewer G24T modules than a chassis with iPower power supplies.
For information about the LEDs and their activity on the F48Ti module, see “I/O Module LEDs” on page 293. Software Requirements The F48Ti module requires ExtremeWare version 6.1.4 or later. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Port 3 Port 3 Port 2 Port 2 Port 1 Port 1 BD_037 For connector pinouts and output signals, see Table 117 on page 353 in Appendix C, “Module Technical Specifications”. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 277
The F96Ti module requires ExtremeWare version 6.1.8 or later and BootROM 6.5 or later. Hardware Requirements Extreme Networks recommends using iPower power supplies (part numbers 50020, 50021, 50022) with F96Ti modules in a BlackDiamond 6800 chassis. A BlackDiamond 6800 chassis with the original power supplies (part number 50012) will power fewer F96Ti modules than a chassis with iPower power supplies.
Page 278
Additional Modules BlackDiamond 6804 iPower power supplies BlackDiamond 6808 original power supplies BlackDiamond 6808 iPower power supplies 1 (ARM, G8Xi, G12SXi, P3cSi, P3cMi, or P12cMi) BlackDiamond 6816 iPower power supplies Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
For information about the LEDs and their activity on the F32Fi module, see “I/O Module LEDs” on page 293. Software Requirements The F32Fi module requires ExtremeWare version 6.1.8 or later and BootROM 6.5 or later. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Two high-performance network processors • A General Purpose Processor (GPP) subsystem The network processors are programmable devices that participate with the Extreme “i” chipset to support expanded functionality, features, and flexibility. The GPP subsystem handles system control and I/O module management functions. The GPP subsystem resides outside of the I/O module data path to optimize performance.
Page 281
BD_P3 Figure 163 shows the P12cSi and P12cMi modules. Figure 163: P12cSi and P12cMi modules Module status LEDs Port Port status status LEDs LEDs Network interface ports Service ports BD_P12 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 282
For more information about PoS module LED activity, see “I/O Module LEDs” on page 293. Service Ports The PoS modules have two front-panel service ports (see Figure 162 and Figure 163): one is a subminiature DB-9 connector; the other is a micro HD-15 connector. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 283
Configuring I/O Modules Both ports are reserved for use only by Extreme Networks technical support personnel for diagnostic procedures. Software Requirements The PoS modules require ExtremeWare 7.0 or later on both the MSM module and the PoS module, BootROM 7.8 for the MSM module, and BootROM 1.18 for the PoS module.
Page 284
• Two high-performance network processors • A GPP subsystem The network processors are high-performance, programmable devices that enhance the Extreme “i” chipset to support expanded functionality, features, and flexibility. The GPP subsystem handles system control and ARM management functions. The GPP subsystem resides outside the packet forwarding data path to optimize routing and billing performance.
Page 285
Service Ports The ARM has two front-panel service ports: one port is a DB-9 connector; the other is a micro HD-15 connector (see Figure 165). Both ports are reserved for use only by Extreme Networks technical support personnel for diagnostic purposes.
Page 286
ARM module, consult your release notes. ARMs installed in a BlackDiamond chassis require at least one BlackDiamond Ethernet I/O module also installed in the chassis in order to operate correctly. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• Two high-performance network processors • A GPP subsystem The network processors are high-performance, programmable devices that enhance the Extreme “i” chipset to support expanded functionality, features, and flexibility. The GPP subsystem handles system control and MPLS management functions. The GPP subsystem resides outside the packet forwarding data path to optimize routing and billing performance.
Page 288
The MPLS module is equipped with two front-panel service ports: one port is a subminiature DB-9 connector; the other is a micro HD-15 connector (see Figure 167). The ports are reserved for use only by Extreme Networks technical support personnel for diagnostic purposes. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 289
MPLS module, consult your release notes. MPLS modules installed in a BlackDiamond chassis require at least one BlackDiamond Ethernet I/O module also installed in the chassis in order to operate correctly. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
BlackDiamond 6800 Series I/O Modules A3cSi and A3cMi Modules Extreme Networks offers the ATM module in the following configurations: • A3cSi—four OC-3 single-mode, intermediate-reach optical interfaces • A3cMi—four OC-3 multimode, short-reach optical interfaces NOTE The “c” in the names of the modules indicates that the optical interfaces on these modules operate in concatenated mode, which enables all the bandwidth to be devoted to a single payload stream.
Page 291
• Two high-performance network processors • A GPP subsystem The network processors are programmable devices that participate with the Extreme “i” chipset to support expanded functionality, features, and flexibility. The GPP subsystem handles system control and I/O module management functions. The GPP subsystem resides outside of the I/O module data path to optimize performance.
Page 292
The ATM module is equipped with two front-panel service ports: one port is a DB-9 connector; the other is a micro HD-15 connector (see Figure 169). Both ports are reserved for use only by Extreme Networks technical support personnel for diagnostic purposes.
1 If you have a PoS module, the link is up, but the PPP/VLAN interface might not be up. To determine whether PPP is up, use show ppp command to display PPP status information. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
4 Hold the module by its front panel with one hand, and place your other hand under the edge of the metal panel to support the weight of the module. Check the connectors for dust and packing materials. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
When the I/O module and its ports (if applicable) are configured and operating normally, the front-panel LED indicators should appear as follows: • STATUS LED—green blinking • DIAG LED—off • Port status LED (per port): Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1 Attach the ESD strap to your wrist and connect the metal end to the ground receptacle on the top-left corner of the switch front panel. 2 Use a #1 Phillips screwdriver to unscrew the two captive screws. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Figure 170: XENPAK module Card edge connector EWUG003B The XENPAK module is a Class 1 Laser device that operates at 5 V. Use only Extreme-approved devices on all Extreme switches. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 298
2 Holding both captive screws, carefully pull the XENPAK Module out of the slot. 3 Place the dust covers back into the XENPAK Module connectors. 4 Place the XENPAK Module immediately into an antistatic container to protect it from ESD damage and dust. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
In the BlackDiamond 6816 or 6804, the fan trays are accessed from the front of the chassis. In the BlackDiamond 6808, the fan tray is accessed from the back of the chassis. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 300
(12.7 mm), as shown in Figure 171 and Figure 172. This action disconnects the power to the fan tray. Figure 171: Removing a BlackDiamond 6816 or BlackDiamond 6804 fan tray BD_030 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1 Attach the ESD strap to your wrist and connect the metal end to the ground receptacle on the top left corner of the switch front panel. 2 Check the connectors for dust and packing materials. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 302
For the BlackDiamond 6808 switch, insert and tighten the screws that you saved earlier. Leave the ESD strap permanently connected to the chassis so that it is always available when you need to handle ESD-sensitive components. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
For specifications of the connectors on the cables used for a console connection, see “Console Port Cables” in Appendix B. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• The console port for Summit switches • The SMMi for the Alpine 3808 and Alpine 3804 switches • The console port for the Alpine 3802 switch • The MSM for BlackDiamond switches 2 At your terminal, press [Return] one or more times until you see the login prompt.
Too much humidity can cause a fire. Too little humidity can produce electrical shock and fire. • When you handle the equipment, Extreme recommends the use of anti-static devices to reduce the risk of electronic damage to the equipment.
• Japan — In Japan, the power cord provided with the power supply or chassis is for use only with that Extreme product. It is not for use with any other Extreme product or other brands of equipment. NOTE When using dual power supplies, make sure that each AC power supply attaches to an independent power source.
When not in use, replace dust cover. Using this module in ways other than those described in this manual can result in intense heat that can cause fire, property damage, or personal injury. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Safety Information Lithium Battery Lithium batteries included with Extreme products are encapsulated and must be replaced by qualified Extreme Service personnel only. Contact your Extreme Service personnel for product replacement. Do not attempt to replace a lithium battery. If these instructions are disregarded and replacement of these batteries is attempted, they should be replaced with the same or equivalent type, as recommended by the battery manufacturer.
Brandes führen. Zu geringe Feuchtigkeit kann zu einem elektrischen Schlag oder einem elektrischen Brand führen. • Extreme empfiehlt für die Handhabung des Geräts die Benutzung von antistatischen Vorrichtungen, um das Risiko elektronischer Schäden am Gerät zu verringern. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 314
Safety Information Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Table 64 lists specifications for environmental requirements, safety, electromagnetic interference, and certification marks that apply to all the Extreme Networks switches. “Console Port Cables” on page 316 provides information about the cables used to connect console ports on Extreme Networks switches.
Table 65 shows the pinouts for a DB-9 male console connector. Table 65: Pinouts for the console connector Function Pin Number Direction DCD (data carrier detect) RXD (receive data) TXD (transmit data) DTR (data terminal ready) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 317
Figure 175 shows the pinouts for a 9-pin to 9-pin (PC-AT) null-modem serial cable. Figure 175: PC-AT serial null-modem cable pinouts Switch PC-AT Serial Port Cable connector: 9-pin female Cable connector: 9-pin female Screen Shell Shell Screen Ground Ground 9pin Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
• EN 55024:1998 Class A (includes IEC 61000-4-2, 3, 4, 5, 6, 8, 11) • EN 61000-3-2,3 (Harmonics & Flicker) • ETSI EN 300 386:2001 (EMC Telecommunications) • 89/336/EEC EMC Directive Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 319
• EN/ETSI 300 019-2-2 v2.1.2 - Class 2.3 Transportation • EN/ETSI 300 019-2-3 v2.1.2 - Class 3.1e Operational • EN/ETSI 300 753 (1997-10) - Acoustic Noise • ASTM D3580 Random Vibration Unpackaged 1.5G Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 320
North America and other countries compatible for use. The power cord provided with a chassis is for use with that Extreme product only. It is not for use with any other Extreme product or other brands of equipment. • ·PSU used outside the US require obtaining a power cord with certifications applicable to the country of interest.
Page 321
48.0 W Acoustic Sound Sound Power in accordance Sound Power: 51.7 dBA per ISO 7779 with EN 300 753 (10-1997) Declared Sound Power: 5.2 belsA per ISO 779 and ISO 9296 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
9.5 A @ 90 VAC, 6.95 A @ 115 VAC, 3.39 A @ 230 VAC Total Output Power W total, 450 W available for PoE applications Temperature Power-off 65° to 75° C (149° to 167° F) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 324
• EN60950:2000+All Available Country Deviations • 73/23/EEC Low Voltage Directive International Safety of ITE • CB Scheme IEC 60950:1999+All Country Deviations • AS/NZX 3260 (Australia /New Zealand) • GOST (Russia) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 325
4A at 100 VAC, 2A at 240 VAC Maximum Inrush 30A at 100 VAC, 50A at 50 VAC Current Output Specifications +12V DC, maximum output current 13A +5V DC, maximum output current 1.5A Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
NEBS GR-63, Issue 2 Power Supply AC Line Frequency 50 Hz to 60 Hz Input Voltage Options 100 VAC to 240 VAC, autoranging Current Rating 100–120 VAC 4 A 200-240 VAC 2 A Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
EN55024:1998 includes IEC 6100-4-2, 3, 4, 5, 6, 11 EN6100-3-2, 3-3 VCCI Class A (Japan) AS/NZS 3548 (Australia/New Zealand) NOM/NYCE (Mexico) MIC Mark (Korea) GOST (Russia) CNS 13438 Class A (Taiwan) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 328
- Declared Sound Power = 5.9 belsA per ISO 7779 & ISO 9296 - Sound Pressure in accordance with NEBS GR-63, Issue 2 · Bystander Sound Pressure = 49 dBA left @ .6m Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 329
100 VAC to 240 VAC Current Rating 100-120 VAC 4 A 200-240 VAC 2 A Summit7i AC Line Frequency 50 Hz to 60 Hz Nominal Operating Voltage 90 VAC to 264 VAC Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Martek supplies: 75° C (167° F) Alpine 3800 Series Switch Specifications The Alpine 3800 series switches include the Alpine 3808, Alpine 3804, and Alpine 3802 switches. Table 82 lists specifications common to all Alpine models; Table 83 lists model-specific specifications.
Page 331
- Declared Sound Power = TBD belsA per ISO 7779 & ISO 9296 - Sound Pressure in accordance with NEBS GR-63, Issue 2 - Bystander Sound Pressure = 68 dBA right @ .6m Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 332
50 Hz to 60 Hz Nominal Operating Voltage 90 VAC to 264 VAC, auto-ranging Current Rating 100-120 VAC 10 A 200-240 VAC 5 A 40 - 70 VDC 30 A Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
AS/NZS 3548 (Australia/New Zealand) NOM/NYCE (Mexico) MIC Mark (Korea) GOST (Russia) CNS 13438 Class A (Taiwan) Telecommunications NEBS/Telcordia, Type IV, Level 3, Issue2 EN/ETSI 300 386-2 v1.1.3 (2000) MIC Telecom Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 334
- Declared Sound Power = 7.7 belsA per ISO 7779 & ISO 9296 - Sound Pressure in accordance with NEBS GR-63, Issue 2 - Bystander Sound Pressure = 67.6 dBA back @ .6m Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 335
-48 DC Power Supply Nominal Operating Voltage 42 V DC to 70 V DC, auto ranging Current Rating 48 V DC 60 A Weight 31.75 lbs (14.4 kg) Switch Power-Off Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Table 87: EPS-LD operational environmental specification overview Ratings Ambient Operating Temperature 0 C to +40 C Storage and Transportation Temperature -40 C to +70 C Operating Relative Humidity 10 - 95% noncondensing Shock—Operational 30 m/s2 (3g) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Table 89: Wire-to-pin connection specifications for the Summit 48si DC power cable Wire Color Lead Wire Wire Label Green/Yellow Chassis Ground Chassis Ground Return Return Black -48 V -48 V unused Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 338
Switch Technical Specifications Table 90: Connector specifications for the EPS-T redundant power connector Diagram Wire Label +12 V +12 V ES4K028 INT PG EXT_CON EXT_PG +5 V +12 V Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 339
• GM-4Ti, GM-4Xi, and GM-4Si module specifications on page 347 • GM-16X and GM-16T module specifications on page 349 • FM-32Ti and FM-24Ti module specifications on page 350 • FM-24SFi and FM-24MFi module specifications on page 351 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 341
Table 95. To identify the ZX Rev 03 module, look for one of the following on the label: • DVA-1203 sticker near the top of the label that covers the Extreme Networks logo • ZX GBIC (1203) text near the top of the label •...
Page 342
1570 nm Table 97: LX100 GBIC specifications Parameter Minimum Typical Maximum Transceiver Optical output power 1 dBm 3 dBm 5 dBm Center wavelength 1546 nm 1551 nm 1557 nm Receiver Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1275 nm 1310 nm 1355 nm Receiver Optical input power sensitivity -23 dBm Optical input power maximum -3 dBm Operating wavelength 1270 nm 1355 nm General Total system budget 13.5 dB Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
1540 nm 1550 nm 1570 nm XENPAK Specifications NOTE Use only Extreme Networks-approved XENPAK modules in all Extreme Networks devices. SR XENPAK Table 102 describes the specifications for the SR XENPAK module. Table 102: SR XENPAK module specifications Parameter Minimum...
1355.9 nm Distance range: 10 km 300 m The LX4 XENPAK supports multimode fiber (MMF) in intra-building connections and single-mode fiber (SMF) for interbuilding connections and has an SC connector. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Alpine Modules CX4 XENPAK NOTE CX4 XENPAKs are also supported with Extreme Networks devices; contact your vendor to obtain these. Alpine Modules Table 107: SMMi module specifications Physical Dimensions Height: 1.0 inches (2.5 cm) Width: 16.25 inches (41.3 cm) Depth: 8.0 inches (20.3 cm) Weight: 4 lbs (1.8 kg)
Page 348
-9.5 dBm -4 dBm Center wavelength 830 nm 850 nm 860 nm Receiver Optical input power sensitivity -17 dBm Optical input power maximum 0 dBm Operating wavelength 830 nm 860 nm Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 349
AS/NZS 3548 (Australia/New Zealand) NOM/NYCE (Mexico) MIC Mark (Korea) GOST (Russia) Environmental EN/ETSI 300 019-2-1:2000 class 1.2 EN/ETSI 300 019-2-2:1999 class 2.3 EN/ETSI 300 019-2-2:1999 class 3.1e ASTM D5276 ASTM D3580 ASTM D3332 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 350
Table 112: FM-24Ti cable specifications Lucent 525 Telco 50-pin RJ-21 Connectors Shielded trunk cable with 25 CAT5 twisted-pairs Cable Minimum Length 100 m Maximum Length 4 inch-pounds Maximum Torque (connector screws) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 351
-20 dBm -14 dBm Center wavelength 1510 nm Receiver Optical input power sensitivity -31 dBm Optical input power maximum -8 dBm Operating wavelength 1510 nm General Total system budget 11 dBm Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 352
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (1997) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 353
4 brown white 29 white brown 5 slate white 30 white slate 6 blue red 31 red blue 7 orange red 32 red orange 8 green red 33 red green Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 354
NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (1997) T1: FCC CFR 47 Part 68 T1: CAN/CS-03 (Canada) T1: JATA Green Book (Japan) E1: CTR 12/13 (Europe) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 355
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (1997) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 357
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 358
• B—Unit continues to function after the test without operator intervention. • C—Temporary loss of function is permitted, provided the function is self-recoverable or can be recovered by the operation of controls Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 359
NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) The RJ-21 port is shown in Figure 177. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 360
2, 6, 1, 3 21, 22, 46, 47 2, 6, 1, 3 23, 24, 48, 49 2, 6, 1, 3 Table 125 describes the output signals for the RJ-21 connector. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 361
Table 126: F96Ti cable specifications Lucent 525 Telco 50-pin RJ-21 Connectors Shielded trunk cable with 12 CAT5 twisted pairs Cable 1 meter Minimum Length 100 meters Maximum Length 4 in-lbs Maximum Torque Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 362
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 363
10 dB Operating wavelength 1310 nm 1310 nm 1310 nm 1310 nm Transmit distance 15 km (9.32 mi) 2 km (1.24 mi) 15 km (9.32 mi) 500 m (0.31 mi) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 364
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 365
GOST (Russia) CNS 13438 Class A (Taiwan) Environmental NEBS/Telcordia, Type IV, Level 3, GR-63 Issue2 EN/ETSI 300 019 Telecommunications NEBS/Telcordia, Type IV, Level 3, GR-1089, GR-63 EN/ETSI 300 386-2 v1.1.3 (2000) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 366
Table 133: Optical interface specifications for the ATM modules Parameter A3cSi A3cMi Power budget 13 dB 9 dB Operating wavelength 1310 nm 1310 nm Transmit distance 15 km (9.32 mi) 2 km (1.24 mi) Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Environmental Requirements Operating Temperature 0° to 40° C (32° to 104° F) Storage Temperature -40° to 70 ° C (-40° to 158° F) Operating Humidity 10% to 95% relative humidity, noncondensing Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 368
Module Technical Specifications Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Installing GBICs and Mini-GBICs GBIC and mini-GBIC interfaces provide installable high-performance ports for Extreme Networks switches. GBICs can be installed in the following switches: • Summit1i • Summit5i • Summit7i • Summit48i Mini-GBICs can be installed in the following switches: •...
Page 370
1 on a G8Xi module located in slot 1 of a modular switch: config ports 1:1 auto off speed 1000 duplex full The UTP GBIC is supported on “i” series products only. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
2 Prepare and clean an external attenuator, if needed. 3 Calculate the link budget. In addition to these tasks, Extreme Networks recommends the following when installing or replacing GBICs on an active network: • Use the same type of GBIC at each end of the link.
Installing GBICs and Mini-GBICs Installing or Replacing a GBIC You can add and remove GBICs from a Extreme Networks switch without powering off the system. Figure 178 shows the three types of GBICs. Figure 178: GBIC types Handle Module A...
2 Inspect and clean the fiber tips, coupler, and connectors. 3 Prepare and clean an external attenuator, if needed. In addition to these tasks, Extreme Networks recommends the following when installing or replacing mini-GBICs on an active network: • Use the same type of mini-GBIC at each end of the link.
LED remains off and an error specifying the use of a non-Extreme Networks-certified mini-GBIC is sent to the syslog. To view the syslog and to determine why the link is down, use the command.
Page 375
If not, the mini-GBIC LED may remain lit even though the mini-GBIC is no longer present. To recover from this LED error mode if the mini-GBIC was incorrectly removed, reinsert the mini-GBIC back into the port, disconnect the fiber cable, and remove the mini-GBIC. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 376
Installing GBICs and Mini-GBICs Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 377
• ZR XENPAK, operating in the 1550 nm range • LX4 XENPAK, operating in the 1310 nm range NOTE CX4 XENPAKs are also supported with Extreme Networks devices; contact your vendor to obtain these. NOTE For XENPAK module specifications, see Module Technical Specifications on page 339.
Installing the Summit Option Card CAUTION The Summit option card cannot be hot-swapped. Before installing the Summit option card in the Summit 400-48t switch, you must turn off the switch. Use only XENPAK modules approved by Extreme Networks. To install the Summit option card: 1 If you are installing a Summit XGM-2xn Option Card, upgrade the software in your switch to ExtremeWare 7.4 (or later).
Figure 182: XENPAK Modules Card edge connector EWUG003C CAUTION Use only Extreme-approved optic devices within Extreme switches. Optical modules provided by Extreme Networks are compliant for use with Extreme systems. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 380
5 Remove the dust covers from the module connectors before you connect cables. 6 If only one XENPAK module is installed, attach a supplied cover plate over the other module slot. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
5 Place the XENPAK module immediately into an antistatic container to protect it from ESD damage and dust. 6 If you are not installing another XENPAK module, cover the opening with a cover plate. Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 382
Installing the Summit Option Card and XENPAK Modules Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 383
LEDs power supply specifications port connections rear view, AC power supply rear view, DC power-off specifications removing the chassis from a rack amperage requirements for UPS serial number 149, 150 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 384
333, 334 BlackDiamond 6816 BlackDiamond 6816 switch rear view 110 VAC power supply Alpine 3802 (AC) 220 VAC power supply Alpine 3802 (DC) -48 VDC power supply Alpine 3804 Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 388
Summit 300-48 IP settings, configuring SMMi module memory size, determining MGMT LED on Summit 400-48t mini-GBIC 23, 373 labeling system for cables installing LED error Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 389
P12cSi module. See PoS module installing P3cMi module. See PoS module loosening for cable removal P3cSi module. See PoS module power cable, external physical specifications Alpine PoE module Alpine 3800 series switch Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 390
EPS-LD power supply 121, 174 Summit 300-24 GBIC Summit 300-48 mini-GBIC Summit 400-24 switch Summit 300-48 power supply Summit 400-48t switch Summit 48si AC power supply power supply specifications XENPAK modules Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 391
Summit 300-24 switch site planning process console port slave MSM front view installing MAC address switchover port connections SMMi module rear view console port specifications description Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...
Page 392
97, 98 FM-32Ti module MAC address FM-8Vi module port configurations G12SXi module power supply G8Ti module rear view G8Xi module reset button GM-4Si module serial number GM-4Ti module specifications GM-4Xi module Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide...