Extreme Networks Summit 300-24 Hardware Installation Manual page 219

Summit 200 e, 300 e, 400 e, i series
Hide thumbs Also See for Summit 300-24:
Table of Contents

Advertisement

Figure 118: Front view of the BlackDiamond 6816 switch with typical I/O modules installed
ESD wrist strap
connector
I/O module
MSM module
I/O module
supplies
The front of the BlackDiamond switch provides the ESD wrist strap connector, slots for installing MSMs
and I/O modules, power supply bays, and access to the fan trays (Figure 119).
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
1
2
3
4
slots
5
6
7
8
A
B
slots
C
D
9
10
11
12
slots
13
14
15
16
Power
BlackDiamond 6816 Switch
BD_6816s
219

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents