Extreme Networks Summit 300-24 Hardware Installation Manual page 109

Summit 200 e, 300 e, 400 e, i series
Hide thumbs Also See for Summit 300-24:
Table of Contents

Advertisement

Mounting the Switch in a Rack
Figure 53: Helper bracket for the Summit7i switch
BDbrackt
2 Place the switch shipping box upright on a secure, flat surface, with the front of the switch facing
you.
3 Remove the switch from the box, and remove the packing material from the switch.
4 Remove the existing screws from the sides of the case (retain the screws for Step 6).
5 Place a mounting bracket over the mounting holes on one side of the unit.
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents