Nortel Passport 15000 Hardware Installation And Maintenance page 199

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

Figure 50
Task flow of a BIP power-and-ground cable installation
BIP power-and-ground cable installation
Removing a side frame panel,
regular or extended sizes
PP_TASK_1072
Installing a power-and-ground
cable assembly
Connecting a power input cable to
a terminal block
Grounding the NEBS 2000 frame
Installing a top frame bracket
onto a NEBS 2000 frame
Checking power input cables
to the BIP
Checking power
output connections
from the BIP
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade
Chapter 14 Power-and-ground hardware of a Passport 15000 or 20000 199
(if required)
Installing front or
rear frame panels
(if required)
Removing front or rear
frame panels
(if required)
Overhead power
cable path?
Yes
Routing power
cables from
overhead to the
BIP
Yes
Installing a side frame
panel, regular size
(if required)
For procedure page
numbers, see
Task flow navigation
below
Routing power
cables from under
No
the floor to the
BIP
Using a power-
and-ground
cable assembly?
No
Connecting power
input cables to the
BIP
End
Installing a side frame
panel, regular size
(if required)
5.2S2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents