176 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
Task flow navigation
The following references are listed alphabetically:
•
"Cable routing" (page 86)
•
"BIP power-and-ground cable installation" (page 197)
•
"Connecting alarm cables to the alarm/BITS module" (page 315)
•
"Connecting a CP local operator terminal cable" (page 299)
•
"Connecting a temperature sensor cable assembly" (page 312)
•
"Connecting an FP cable" (page 320)
•
"Installing a BIM" (page 374)
•
"Installing a BIP alarm module" (page 378)
•
"Installing a BITS cable" (page 388)
•
"Installing a blank processor card" (page 393)
•
"Installing a CP" (page 399)
•
"Installing a fabric card into a Passport 15000" (page 434)
•
"Installing a fabric card into a Passport 20000" (page 439)
•
"Installing a PIM cable" (page 487)
•
"Installing a shelf assembly" (page 503)
•
"Installing a shelf-based BIP" (page 512)
•
"Installing a shelf-based cooling unit" (page 514)
•
"Installing a strain-relief bar" (page 535)
•
"Installing a temperature sensor bracket assembly" (page 536)
•
"Installing an FP" (page 574)
•
"Installing cable management brackets" (page 597)
•
"Installing front adapter brackets" (page 610)
•
"Installing grounding tape on rack uprights" (page 618)
•
"Installing short adapter brackets on the front of the rack" (page 628)
•
"Installing short adapter brackets on the rear of the rack" (page 624)