Figure 41
Task flow of parts installation in a Passport 20000 in a NEBS 2000 frame
Parts installation in a
Passport 20000 in a
NEBS 2000 frame
Installing a BITS cable
Seating fabrics from the
transportation position
Seating cards from the
transportation position
Installing a fanout
(if necessary)
Installing a
sparing panel
(if necessary)
Removing front or
rear frame panels
(if present)
Removing a side frame
panel, regular or extended
(if present)
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade
panel
Chapter 11 Initial switch hardware installations 169
Cable routing
Connecting an FP
cable
Connecting a CP
local operator
terminal cable
Peripheral
equipment
Installing a shelf filler
panel
(optional)
BIP power-and-ground
cable installation
Powerup of a
Passport 15000 or
20000
Installing front or
rear frame panels
(if required)
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1092
End
Door
installation
(if required)
Side frame panel
installation
(if required)
5.2S2