790 Chapter 17 Hardware procedures
241-1501-240 5.2S2
9
Route the cable along the noted path.
10 Plug in the other end. Ensure the tabs on the connector have engaged.
Leave the other cables of the new assembly temporarily hanging and
disconnected.
11 Remove the tape and switch on the breaker for that PIM (press the | half
in). The generated alarms end.
12 Repeat step 2 to step 11 for each other cooling unit cable until the new
cable assembly completely replaces the old.
13 Balance all cable slack and fasten with tie-wraps. Cut off the tie-wrap tails.
14 Observe the LEDs of the cooling units fed by that cable. Green indicates
normal operation.