Nortel Passport 15000 Hardware Installation And Maintenance page 36

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

36
About this document
241-1501-240 5.2S2
added to the Prerequisites of these tasks a cross-reference to
understanding the use of a compatible or an equivalent FP:
— "FP upgrade" (page 145)
— "Replacement of a failed FP" (page 150)
— "Replacement of an FP with one of a different card type" (page 153)
added the Prerequisite about the BIP to the task flow "Installation of a
second switch into a NEBS 2000 frame" (page 156)
added the PEC of a frame to the task flow "NEBS 2000 frame
installation" (page 161)
added CP cabling procedures that were missing from these task flows:
— "Installation of a second switch into a NEBS 2000 frame"
(page 156)
— "Parts installation in a Passport 15000 in a NEBS 2000 frame"
(page 165)
— "Parts installation in a Passport 20000 in a NEBS 2000 frame"
(page 168)
— "Passport 15000 or 20000 switch installation into an EIA rack"
(page 173)
added the procedure "Removing a shelf filler panel" (page 721) to the
task flow "Installation of a second switch into a NEBS 2000 frame"
(page 156)
added the missing CP cable procedures to the task flow "Installation of a
second switch into a NEBS 2000 frame" (page 156)
added the switch package numbers to "Passport 15000 or 20000 switch
installation into an EIA rack" (page 173)
updated the Prerequisites to the task flow "MAC address module
replacement" (page 179), including adding the alarm number that
indicates it has failed
changed the requirements for matching BIMs to a BIP version in:
— "Prerequisites to installation of a second switch into a NEBS 2000
frame" (page 156)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents