36
About this document
241-1501-240 5.2S2
•
added to the Prerequisites of these tasks a cross-reference to
understanding the use of a compatible or an equivalent FP:
— "FP upgrade" (page 145)
— "Replacement of a failed FP" (page 150)
— "Replacement of an FP with one of a different card type" (page 153)
•
added the Prerequisite about the BIP to the task flow "Installation of a
second switch into a NEBS 2000 frame" (page 156)
•
added the PEC of a frame to the task flow "NEBS 2000 frame
installation" (page 161)
•
added CP cabling procedures that were missing from these task flows:
— "Installation of a second switch into a NEBS 2000 frame"
(page 156)
— "Parts installation in a Passport 15000 in a NEBS 2000 frame"
(page 165)
— "Parts installation in a Passport 20000 in a NEBS 2000 frame"
(page 168)
— "Passport 15000 or 20000 switch installation into an EIA rack"
(page 173)
•
added the procedure "Removing a shelf filler panel" (page 721) to the
task flow "Installation of a second switch into a NEBS 2000 frame"
(page 156)
•
added the missing CP cable procedures to the task flow "Installation of a
second switch into a NEBS 2000 frame" (page 156)
•
added the switch package numbers to "Passport 15000 or 20000 switch
installation into an EIA rack" (page 173)
•
updated the Prerequisites to the task flow "MAC address module
replacement" (page 179), including adding the alarm number that
indicates it has failed
•
changed the requirements for matching BIMs to a BIP version in:
— "Prerequisites to installation of a second switch into a NEBS 2000
frame" (page 156)