Site Preparation Checklist for ACX2000 and ACX2100
Routers
The checklist in
Table 22 on page 68
router installation.
Table 22: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of routers
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the router.
summarizes the tasks you need to perform when preparing a site for
For More Information
"ACX2000 and ACX2100 Router Environmental
Specifications" on page 73
"ACX2000 and ACX2100 DC Power Specifications" on
page 65
"ACX2100 AC Power Specifications" on page 62
"ACX2000 and ACX2100 Universal Metro Router
Overview" on page 17
"Rack Requirements for ACX2000 and ACX2100
Routers" on page 78
"Cabinet Requirements for ACX2000 and ACX2100
Routers" on page 76