Xerox Document Binder 120 Operator's Manual page 69

Table of Contents

Advertisement

PREPARING THE BINDER 120 FOR ON-LINE AND OFF-LINE OPERATION
Checklist for connecting to a Xerox 5388
3-52
Below is a checklist of the steps described in the preceding pages for
connecting to a Xerox 5388. Once you become thoroughly familiar
with the procedure, you may wish to use this checklist as a quick aid
when connecting to the host machine.
1.
Press the Binder 120 Power Switch to the Off (O) position.
2.
Unplug the Binder 120.
3.
Raise the Interface Module to the diamond (u) position.
4.
Move the Alignment Bracket out of storage to the diamond (u)
position.
5.
Extend the Receiving Plate outward.
6.
Rotate the Receiving Plate up as far as it will go.
7.
Unlock the Binder 120 Casters.
8.
Move the Binder 120 toward the host machine.
9.
Plug in the Binder 120.
10.
Press the Binder 120 Power Switch to the On (I) position. Wait
for the warm up message.
11.
Connect the Interface Cable.
12.
Align the Binder 120 with the host machine.
13.
Rotate the Receiving Plate down until it rests on the Output Tray
of the host machine.
14.
Lock the Binder 120 Casters.
XEROX DOCUMENT BINDER 120 OPERATOR MANUAL

Advertisement

Table of Contents
loading

Table of Contents