Mounting On Multi-Pos Stand; Figure 6: Product Mounted On Multi-Pos Stand; Figure 7: Cable Routing On Multi-Pos Stand - HEIDENHAIN POSITIP 8000 Operating Instructions Manual

Milling
Hide thumbs Also See for POSITIP 8000:
Table of Contents

Advertisement

Mounting | Assembly of the product
4.2.3

Mounting on Multi-Pos stand

Use the provided M4 x 8 ISO 14581 countersunk head screws (black) to fasten
the stand to the VESA 100 threaded holes on the rear panel
Comply with the permissible tightening torque of 2.6 Nm
Using two M5 screws, you can also optionally screw the stand to a supporting
surface from the bottom
Adjust the desired angle of inclination within the tilting range of 90°
To fix the stand: Tighten the T25 screw
Comply with the tightening torque for screw T25
Route the cable from behind through the two supports of the stand and then
through the lateral openings to the connections
Figure 6: Product mounted on Multi-Pos
stand
Further information:
HEIDENHAIN | POSITIP 8000 | Operating Instructions Milling | 03/2020
Recommended tightening torque: 5.0 Nm
Maximum permissible tightening torque: 15.0 Nm
"Product dimensions with Multi-Pos stand", Page 307

Figure 7: Cable routing on Multi-Pos stand

4
43

Advertisement

Table of Contents
loading

Table of Contents