Forced Checking Procedure (Test Stop) With Power On - Siemens SINAMICS S120 Function Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

11.2.6.2

Forced checking procedure (test stop) with POWER ON

Forced checking procedure (test stop) can be automatically executed at POWER ON.
● If the forced checking procedure (test stop) as well as the test of the F‑DO for the CU310-2
are to be executed automatically, then set p9507.6 = 1. When testing the F-DO of the
CU310-2, you must parameterize p10042 and activate the test in p10046.
● If the forced checking procedure (test stop) of the F‑DI and F‑DO of the TM54F is to be
executed automatically, then set p10048 = 1.
● If you have parameterized the forced checking procedure (test stop) for POWER ON, you
can still initiate a forced checking procedure (test stop) at any time as part of the engineered
application.
● If the automatically initiated function cannot be correctly completed as a result of a problem
(e.g. communication failure), then after the problem has been resolved, the function is
automatically restarted.
● After the forced checking procedure (test stop) has been performed successfully, the
converter goes into the "Ready" state.
● Timer p9659 is automatically reset as a result of the forced checking procedure (test stop).
● The automatic forced checking procedure (test stop) for POWER ON does not influence the
Safety Integrated Functions.
Drive functions
Function Manual, 06/2019, 6SL3097-5AB00-0BP2
Safety Integrated Basic Functions
11.2 General information
641

Advertisement

Table of Contents
loading

Table of Contents