Installing and cabling the media gateways
Install and connect the media gateways before, in parallel with, or after installing and
configuring the media server complex. The media gateways must be installed and powered up
to effectively complete many of the other stages. The IPSI circuit packs can be programmed
only in a powered-up media gateway.
Completing the installation administration
Finish the media server installation by clearing alarms, enabling alarm reporting, backing up the
server files, and registering the configuration.
Testing the finished installation
This stage verifies the complete configuration operation and is the last task.