8-6 Ordering information and system engineering rules

Site engineering recommendations

Consider the following site engineering recommendations when planning a
network deployment.
1 Breaker interface panels or fuse panels should be installed at the top of the
2 Recommendation is to use 2x6 Amp breakers or fuses for the dual DC
3 Recommendation is to leave 1U space between OME6130 shelves when
4 Optical fiber cables should be routed on the right side of the bay.
5 E1/DS1 electrical interface cable should be routed on the right side of the
6 Install power cables on the left side of the OME6130 bay.
7 Install OAM cables (for Alarm Input, Alarm Output, M1/F1 and ESI ports)
8 The Ethernet cables should be routed on the right side of the bay for the
Optical Multiservice Edge 6130 NT6Q92MA Rel 1.0 Iss 1 Standard September 2006
bay.
power feeds for each OME6130 chassis.
installed in the same rack to provide added air flow through the equipment.
Note: No fiber slack storage is provided for fibers terminating on the
OME6130 shelf. Use external fiber management drawers to store excess
fiber cable.
bay for the 28xE1/DS1 circuit pack.
on the left side of the OME6130 bay.
8xETH circuit pack, and on the left side of the bay for the LAN and Craft
ports for DCN access.