Nortel Optical Multiservice Edge 6130 Planning Manual page 172

Table of Contents

Advertisement

8-30 Ordering information and system engineering rules
Procedure 8-2 (continued)
Ordering cables, documentation, and services
Step
3
4
5
6
7
8
9
10
Optical Multiservice Edge 6130 NT6Q92MA Rel 1.0 Iss 1 Standard September 2006
Action
Order fiber patchcords. Refer to
page 8-15
for orderable codes and application rules.
Note: The STM-1/4 optical SFP modules on the OME6130 support duplex
LC connections. Nortel Networks recommends the use of duplex patchcords
wherever allowed by the subtending equipment.
Order environmental alarm kits. Order one environmental alarm kit for the
number OME6130 network elements specified on
Note: Refer to
Table 8-18 on page 8-17
application rules.
Order the number of LAN 10/100BT Ethernet cables specified in
connect to the OME6130 network elements to the DCN.
Note: A regular straight 10/100BT Ethernet cable (RJ-45 to HUB RJ-45) will
accommodate this connection. Refer to
orderable part numbers and application rules.
Determine the next step:
If
Line 6
is
Then go to
Yes
step 7
No
step 8
Order one modem cable, NT6Q71AG, for each site.
Note: Refer to
Table 8-17 on page 8-16
application notes.
Determine the next step:
If
Line 7
is
Then go to
Yes
step 9
No
step 10
Order the synchronization cable required.
If
Line 8
is
Then order
75 ohm
one (1) NT6Q71AE, Clock (BITS) Cable (inc 75 ohm
convertor)
120 ohm
one (1) NT6Q71AC, Clock (BITS) Cable (120 ohm)
Note: Refer to
Table 8-19 on page 8-17
application notes.
Order documentation. Nortel Networks recommends that one CD-ROM be
ordered for each site. Alternatively, a paper library is available.
Note: Refer to
Table 8-24 on page 8-19
notes.
Table 8-15 on page 8-14
Line
for orderable part numbers and
Table 8-17 on page 8-16
for orderable part numbers and
for orderable part numbers and
for orderable codes and application
and
Table 8-16 on
4.
Line 5
to
for

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents