Ordering Procedures - Nortel Optical Multiservice Edge 6130 Planning Manual

Table of Contents

Advertisement

Ordering information and system engineering rules 8-21
updated to become RoHS compliant, nor is there any change required to the
software deployed - the revised RoHS compliant equipment is backward
compatible with the non-RoHS compliant version. Thus, customers outside the
EU may order the standard equipment but may receive a RoHS compliant
version.
RoHS compliant equipment include labels which indicate the RoHS
compliance level.
Further information on the Nortel RoHS strategy will be made available on the
appropriate product pages on the Nortel web site (www.nortel.com).

Ordering procedures

Use the following procedures to order equipment, software, documentation,
and services for an OME6130 network deployment.
Planning Guide NT6Q92MA Standard Rel 1.0 Iss 1 September 2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents