Mx2020 Site Preparation Checklist; Table 40: Mx2020 Site Preparation Checklist - Juniper MX2020 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

MX2020 3D Universal Edge Router Hardware Guide
Related
Documentation

MX2020 Site Preparation Checklist

Table 40: MX2020 Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors
such as temperature and
humidity do not exceed router
tolerances.
Power
Measure distance between
external power sources and
router installation site.
Locate sites for connection of
system grounding.
Calculate the power
consumption and requirements.
Rack
Verify that your rack meets the
minimum requirements for the
installation of the router.
NOTE:
There must be a
minimum of 45U of usable rack
space when installing the
MX2020 router into a 45U rack.
120
of the power supply cord. This separate protective earth terminal must be
permanently connected to earth.
Grounding the MX2020 Router on page 247
Tools and Parts Required for Connecting the MX2020 Router to Power on page 192
MX2020 AC Power Electrical Safety Guidelines on page 584
The checklist in
Table 40 on page 120
preparing a site for router installation.
For More Information
"MX2020 Router Environmental
Specifications" on page 116
"MX2020 DC Power Distribution
Module Description" on page 94
"MX2020 Router Grounding
Specifications" on page 117
"MX2020 AC Power Requirements"
on page 147
"MX2020 DC Power Requirements"
on page 171
"MX2020 Rack Requirements" on
page 110
"MX2020 Cabinet Size and
Clearance Requirements" on
page 106
summarizes the tasks you must perform when
Performed By
Copyright © 2015, Juniper Networks, Inc.
Date

Advertisement

Table of Contents
loading

Table of Contents